My WebLink
|
Help
|
About
|
Sign Out
Home
2006_0327_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2006
>
2006_0327_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 12:23:30 PM
Creation date
8/26/2009 3:33:08 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />Miscellaneous Bituminous pavement milling <br />Ace Blacktop <br />Bituminous Roadways <br />T.A. Schifsky <br />Tower Asphalt <br />Midwest Asphalt <br />Bituminous tack oil <br />Ace Blacktop <br />Bituminous Roadways <br />T. A. Schifsky <br />Tower Asphalt <br />Midwest Asphalt <br />As�halt Paving Public Works Yard. Rosebrook. and Villa Parks <br />Bituminous Roadways <br />Tower Asphalt <br />Ace Blacktop <br />T. A. Schifsky <br />Midwest Asphalt <br />4180 s.v. LVWE4S030B'/z" �athwa�paving <br />T. A. Schifsky <br />Tower Asphalt <br />Ace Blacktop <br />Midwest Asphalt <br />Bituminous Roadway <br />Miscellaneous Patchin,� and Paving <br />T. A. Schifsky <br />Tower Asphalt <br />Bituminous Roadway <br />Ace Blacktop <br />Midwest Asphalt <br />$ 20.00 s.y. <br />25.00 s.y. <br />30.00 s.y. <br />40.00 s.y. <br />50.00 s.y. <br />$ 2.00 gal <br />5.00 gal <br />5.00 gal <br />10.90 gal <br />15.00 gal <br />�39,510.00 <br />42,102.00 <br />43,243.00 <br />46,309,00 <br />49,198.00 <br />�38,160.00 <br />39,600.00 <br />45,180.00 <br />46,152.00 <br />46,800.00 <br />�19,200.00 <br />19,200.00 <br />24,000.00 <br />24,864.00 <br />29,280.00 <br />Financial Implications: Street maintenance materials, contractual concrete work, paving, <br />reclamation, and miscellaneous patching are financed out of the Street Maintenance, Pathway <br />and Parking Lot Maintenance, and Utility budgets. The combined bids received are somewhat <br />higher than the budgeted estimates. Staff feels the bids received are the current market rates for <br />the items bid. Increases are due to increased energy costs for production of the materials and <br />transportation costs. <br />Staff Recommendation: Staff recommends to award to the low bidder in each of the categories <br />listed above. <br />
The URL can be used to link to this page
Your browser does not support the video tag.