My WebLink
|
Help
|
About
|
Sign Out
Home
2006_0327_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2006
>
2006_0327_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 12:23:30 PM
Creation date
8/26/2009 3:33:08 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />REQUEST FOR COUNCIL ACTION <br />DATE: 3/2 f <br />ITEM NO.: 4.i <br />Dr��rtr��nt.,�p�rru+r��= IV[�d � ger Rfi��s�,���d: ��tnda �.etti�, n. <br />• — -.� � � •� .� {'tms� r�L <br />� - �� ���=� � �� �..��� <br />Item Description: Award Bid for S. Qwasso Boulevard reconstruction <br />Background: On August 8,2005, the City Council approved the plans and specifications for the S. <br />Ovvassa Boulevard reconstruction project. Last fall, Jay Brothers completed the South Ovvassc� <br />Boulevard Surcharge contract in preparation for this year's reconstruction project. This project between <br />Rice Street and Dale Street is the complete reconstruction of the road, along with storm sewer <br />improvements in the Ladyslipper Park area. The bids for this project were opened on Wednesday, <br />March 22,2006 at 9:OU am. <br />Policy objectives: Based on past practice, the City Council has awarded the contract to the lowest <br />responsible bidder. In the case of S. Qwasso Blvd Reconstruction, the lowest bidder is Forest Lake <br />Contracting of Forest Lake, Minnesota. <br />Financial implications: We received five bids for S. Owasso Boulevard Reconstruction. The low bid <br />submitted by Forest Lake Contracting, $1,998,204.52, is 4% higher than the Engineer's construction <br />estimate of $1,92I,948.50. This should not adversely impact proposed assessments or estimated project <br />costs discussed in the feasibility report since those estimates included a 10% construction cost <br />i <br />contingency. The following is a list of the bids received: <br />�+�i�i�r.� �������-� r <br />E���rt��L � aic� [ � �o-n�e�tiiie3� � � � ] .'��R, �i}�, �^ � <br />]� raLC:iL��rEC C'�7 i7 �p�,i <br />1'r�l�fl � �cm 4 <br />Arnt Construction C <br />= Park Construction <br />] rrc _ <br />1 n�; <br />�52, E �i9,�{]�_�[) <br />��. [�l�a.l ���.{]3 <br />5�,�}-�,���,�� <br />��,����,k'��.SS <br />RECOMMENDED COUNCII, ACTION: <br />Approval of a resolution awarding hid for S. Owasso Blvd Reconstruction project in the amount of <br />$1,998,204.52 to Forest Lake Contracting of Forest Lake, Minnesota. <br />Prepared by: Debra Bloom <br />
The URL can be used to link to this page
Your browser does not support the video tag.