Laserfiche WebLink
� � � + � ����1�� � <br />� T�1 I L D� R 3 � 13 Ira tif � L 4 P ri R 5 <br />A DEY15JOh! OF THE kU'f'7'LUNb COMPANY. iidC. MN �LDR. LIC. BIS35 <br />Apri121,2006 <br />Mr. Thomas Paschlce <br />Planning Director <br />City of Roseville <br />2660 Civic Center Drive <br />I�o�seville, MN 55113-1815 <br />Re: Supplemental �nteria�a Use Permit Information <br />Twin Lalces Redevelopment — Phase One <br />Dear Mr. Paschlce, <br />The purpose of this Ie�ter is to provide additional informationrelating to our application for approval of <br />an Interim Use Permit for the Twin Lalces Redevelopment proj ect, as follows: <br />ose: Twelve buildings and the surroaxrxdaz�g paved areas will need to be demolished as part of the <br />redevelopmentproj ect. Concrete and asphalt demolition material can be recycled by crushing the <br />removed materials and utilizing the recycled material as a quality road base. Recycling is an <br />environmentally sound construction practice. It allows for the reduction of demand for new aggregate, re- <br />use of valuable materials, reduces wastestream to la�dfills and reduces hauling on-off site. If concrete <br />and asphalt demolition materialswere hauled off-site, approximately4,300 �ruok trips would be generated <br />to and from the site via Cleveland Avenue, County Road C, and County Road C-2. <br />Redevelopment Sta.�in��. Redevelopment of the site will begin with the demolition of the existing <br />buildings, grading, and remediation. Buildingdemolitionwill begin in May and June 2006 and continue <br />throughout the summer. As demolished concrete and asphalt are collected, they will b e hauled from the <br />building demolitionsite to the stockpile in the crushing staging area. Crushing of the stockpiled material <br />will commence upon completion of the anticipated 2006 building demolition �lat� fall 2006 and winter <br />2007. Crushing activities are anticipatedto last approximately five weel�.s and should be completed by <br />February 10,2007. <br />Hours of Operat�on: This type of crushing operation typically involves a minimum 12-hour worlcday. If <br />requested by the City, crushing operations could be restricted to Monday through T'riday, between 7:00 <br />a.m. to 7:00 p.m. with no weelcend crushing activity. Late falllwinter crushing activity is preferred, as it <br />is easier to achieve quality standards by crushing cold concrete and asphalt. In addition, noise impacts arc <br />reduced in the colder months, as windows are typically closed. Late falllr�vinter crushing will require <br />lighting the recycle plant and staging area. For this site, crushing contractors ha�e indicated a preference <br />of implementing one crushing cycle. We estimate five weel�.s of crushing activity is needed to crush the <br />estimated 60,000 tons ofstockpiledrecycle material. <br />3065 CENTRE POiNTE DRIVE <br />R05EVILLE MN 55113 <br />�t I tiS I 63b.Cd5C� =.ax: n5 i e�e.cr� EQUAL HOUSING � <br />14Y �4_I}r DYi �f2 1 SE U 7 k� ��� OPPORTUNITY <br />