My WebLink
|
Help
|
About
|
Sign Out
Home
2006_0710_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2006
>
2006_0710_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 9:33:12 AM
Creation date
8/26/2009 3:37:32 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
safety relief valves shall include one (1) three way valve. The valves shall meet ;�i� <br />requirements of the project specifications. The cost of the additionalwork is $5,520.00 <br />E, Replace the one (1) existing brine pump with the exact model. The impeller size shall match <br />the impeller size on the new brine pumps. The pump shall be the requirements of the project <br />specifications. The cost of the additional work is $4,689.00 <br />�. Replace si�een (16) %" ball valves for the existing ice rink floor with new steel valves. <br />Remove and dispose of the existing valves and pipe material. The cost of the additional work <br />�54��•TT1�IL1 <br />G, Repair the steel support brackets in the floor expansion joints by using a welded connection. <br />The cost of the additional work is $420.00. <br />H, Replace one (1) existing 3/a inch reliefvalve on the existing expansion tanks with a 1'/� inch <br />new relief valve. Remove and dispose of the existing valve. The cost of the additional work is <br />$688.00 <br />I. Delete supplying the calcium chloride solution for the system. lnstalS the calcium chloride <br />solution that will be delivered to the site by the Owner's representative. Coordinate delivery <br />date and time with the Owner. The deduct for this work is ($23,760.00). <br />�. Adjust price deduct for steel frame work as described in Item N in Change Order No. 1. The <br />correct deduction from the contract price shall be $8500.00— $855.00 =$7,E45.�0. The actual <br />amount deducted from the contract in Change Order No. 1 was $8415.00. Therefore add <br />$8415.00 — 7645.00 � $770.00 to the contract. <br />Change to Contract Price: <br />Original Contract Price: <br />Current Contract Price: <br />Contract Price with this Change Order: <br />($ 2,388.00 ; <br />$ 283,820.00 <br />$ 392,024.60 <br />$ 389,636.60 <br />Increase to Project Completion Date: � Working Days for all items except for item E. The <br />pump in item E shall be installed as soon as received by the contractor. <br />Recommended for Approval by: <br />Engineer: Stevens Enqineers,lnc. <br />�r: �� �, �� X�-�=��' <br />�rar-r� �7ile <br />Change Order No. 2 Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.