Laserfiche WebLink
City Council Regular Meeting— 07/1.0/06 <br />Draft Minutes - Page 17 <br />S.h Authorize Change Orders and Project Close-Out for <br />the Repair and Upgrades of the Refrigeration System <br />at the Roseville Skating Cen�terlGuidan� John Rose <br />OVAL <br />Maschka moved, Pust seconded, authorizing Change <br />Order # 1 in the amount of $108,204.60 for the brine <br />piping replacement and re-insulation. <br />Roll Call <br />Ayes: Maschka; Pust; Kough; Ihlan and Klausing. <br />Nays: None. <br />Maschka moved, Pust seconded, authorizing Change <br />Order #2 in a deduct amount of (-$2,388.00) for <br />replacement of safety valves, brine pump #2, relief valve <br />replacement and a deduct for the Brine replacement cost <br />due to the Un�var/Dow Chemical Donation. <br />Roll Call <br />Ayes: Maschka; Pust; Kough; Ihlan and Klausing. <br />Nays: None. <br />Maschka moved, Pust seconded, authorizing Change <br />Order #3 in the amount of $6,727.40 for the brine pump <br />electrical work, flow switch replacement, shaft seal repair, <br />and expansion tank air vent replacement. <br />Roll Call <br />Ayes: Maschka; Pust; Kough; Ihlan and Klausing. <br />Nays: None. <br />Maschka moved, Pust seconded, authorizing Change <br />Order #4 in the amount of $891.62 for the replacement of <br />the three-way ammonia valves on the chiller. <br />Roll Call <br />Ayes: Maschka; Pust; Kough; Ihlan and Klausing. <br />Nays: None. <br />Maschka moved, Pust seconded, authorizing Change <br />Change Orders and <br />Proj ect Close-Out <br />Repair and <br />Upgrades of the <br />Refrigeration <br />System <br />Guidant John Rose <br />OVAL <br />