Laserfiche WebLink
The Community Development staff recommends approval of a 892 s.f. lot size variance to Section <br />1004.016 (Residential Dimensional Requirements) for new Parcel "B", and, <br />approval of a minor subdivision to allow the creation of one substandard residential parcel for <br />property located at 1822 Dale Court. <br />The recommendations are based on the findings in Section 5 of the project report dated August 3, <br />2005 and are based on compliance with the following conditions: <br />The City policy is to require payment of the Metro Area SewerAvailability Charge (SAC) upon the <br />issuance of a building permit. In this case, a$1,500 SAC fee is required and will be collected with the <br />issuance of a building permit for Parcel " B. <br />The applicant must record the finro lot minor subdivision survey within 60 days after the approval of <br />the City Council. Public utility and drainage easements of 5 feet are required on the sides and rear lot <br />line. <br />For Parcel "B", the applicant must apply for and receive a Dale Court driveway access permit from the <br />Roseville Public Works Director prior to issuance of any building or grading permit. The existing <br />looped driveway must be removed as part of the building permit, or the owner of Parcel B must <br />provide an access easement for continued use of the driveway by the owner of Parcel A. It the looped <br />drive is to remain, the access easement must be submitted as part of the building permit application. <br />A grading plan, soil borings, and the survey ("B" above) illustrating lot lines and house setbacks must <br />be submitted with the building permit application. <br />VUthin thirty (30) days after approval by the City Council, the applicant shall supply the final survey to <br />the Community Development Director for review and approval. A certificate of survey shall be <br />required on all proposed parcels. After completion of the review and approval by the City Manager, <br />the survey shall be recorded by the applicant with the Ramsey County Recorder within sixty (60) <br />days. Failure to record the subdivision within sixty (60) days shall nullify the approval of the <br />subdivision. (Ord. 1171, 9-23-1996) <br />Member White asked if a variance could be requested by the future owner (yes). I s there a house <br />plan to approve with this request? (No, not at this time). <br />Member Boerigter asked for clarification of the conditions which would be placed on the future house <br />He asked if the lot size variance was unusual in Roseville (no). Where would the access point <br />(driveway) be located? (on Dale Court). What is the lot coverage? (less than 30%). <br />Member White asked if the new owner of the lot is almost required to get a variance (no) because the <br />Planning Commission is validating the need for a variance by approving the lot. Member Wozniak <br />asked if the conditions prohibiting a variance could be stated. (cannot prohibit a future owner from <br />requesting a variance). Member poherty expressed concern that the next buyer will not understand <br />the restriction of this lot. Member White asked if the Commission could describe his requirements to <br />build within the setback triangle on the lot. <br />Todd Iliff, representing the ownerand family, explained the proposal to sell the lot. He said safety and <br />sight line issues are not major concems when turning on to Dale Street. The design of the home, <br />reasonably sized, would be consistentwith the neighborhood. He did hire an architectwho tested a <br />number of housing shapes. Member White described a similar home on Como Avenue. <br />Member Bakeman asked for sewer and soil boring information on the site. Mt. Iliff explained that there <br />has been no problem on the site for the past 30 years. <br />