My WebLink
|
Help
|
About
|
Sign Out
Home
2006_1023_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2006
>
2006_1023_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2014 3:54:31 PM
Creation date
8/26/2009 3:40:05 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
281
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�� iSr� i'YI <br />How does the project support local and regional Environmental Services (sanitary <br />s�rrverlstortr� sewer) system plans? Check those that apply <br />e f f i c i e n t 1 y utilizes sanitary sewer infrastructure, X rtlanages inflow and in£iltration <br />(�&T} issues, 1 o w flow plumbing, s u b metering, _gr•ay water reuse, X uses <br />on-site storm water management techniques, ,� conserves surface water, c o n s e r v e s <br />groundwater, l i m i t e d irrigation, u s e of native vegetation, o t h e r(describe) <br />The,pr�iect ipcl�clea+���i,���e �M�# ru ��oulrul �#�trt� l�af v�'iEE couLer�i rua�urF <br />a� � i �uru�r tftr [�uaEilY. �tt 1}f?�� �1p�l�c�lia-n sl+��c����:� <br />c. How does the project support local and regional Parks system plans? Checkthose that <br />aPPrY <br />prnvides connections between the project and regional and local parks, <br />p r o v i d e s connections between the project and regional and local trails, provides <br />connections between other natural areas, p r o v i d e s natural buffers provides natural <br />buffers (if the project is adjacent to park and/or natural areas), <br />other{describe) <br />7. Efficient Use of Current Infrastructure <br />Does the project require substantial infrastructure investments (both existing capacity and <br />new capacity needed), including roads and/or highways, transit, wastewater, utilities, <br />telecommunications infrastructure, or other infrastructure? `Y`es X Na If "Yes" <br />describe or attach a brief description of the needs and the plans to provide them, including <br />how the investments will be funded. <br />8. Consistency with Local Comprehensive Plan <br />Is the project consistent with the Met Council approved local comprehensive plan? �i Yes <br />N o . If "No" explain <br />9. Readiness/Market Demand <br />a. When will the site be ready to clean up, including having funding available? (This can <br />include the requested DEED, TBRA and County funds in the current grant round) <br />.�a�uarv month ��� year <br />b. What are the development plans for the site af�er clean-up and/or mitigation? Please <br />attach a narrative description. Include rationale for anticipated market demand for this site <br />(one page summary if possible). See Exhibit 2. <br />c. Is there a commitment at this time from an end-stage developer for this site? <br />X Yes Na <br />Fleas� attach relevant commitment letters, (see DEED Applieatio� Attachment 141, <br />capital improvement plans, city council resolutions (see DEED ApU�ieation Attachment <br />�, etc. to show readiness to proceed if TBRA grant funds are provided. See also, DEED <br />Aqqlication Attachment 1 and Section I"'V�. <br />d. When will the planned development be complete? � month ��44 year <br />10. Efficiency Check those that apply. �To be supplied bv Moser/Zai�arlskil <br />a. Have ef£iciency measures been incorporated in the project? (such as those outlined in the <br />State of Minnesota's Building, Benchmarks and Beyqnd Guidelines) Y e s N o <br />3571633.1 i� <br />
The URL can be used to link to this page
Your browser does not support the video tag.