Laserfiche WebLink
R�sevi��e Skating Center <br />BONDING PROJECTS <br />1- �estroom Expansion and Remodeling ( 540 S.F.) <br />2- Zamboni Lounge Partition <br />3- Pass-thru Hallway - Zamboni Lounge to Oval Changing <br />4- Basement space ( 596 S.F.) <br />5- V�(den stairwaylhallwayto Lower Level Arena <br />6- Lobby Addition (1,850 �.f_� <br />� <br />$ <br />$ <br />$ <br />� <br />$ <br />��, ���. �� <br />�Q����.0� <br />�8,0��.� <br />3�.���.0� <br />��,���.�� <br />���.���.�� <br />7- Archiiect�rel�ngine�rir�g Fees $ ��.���.�� <br />8- Facility Monitoring Equipment � �5,���.�� <br />GRAND TOTAL OF PRELIMINARY PROJECTS $ E��J,3��_{�� <br />TOTAL PROJECT BUDGET $ ��,0�€�_�� <br />NEED TO REDUCE PROJECT COSTS BY $ 7��,���.D� <br />POTENTIAL REDUCTION ITEMS <br />2- Zamboni Lounge Partition <br />3- Pass-thru Hallway - Zamboni Lounge to Oval Changing <br />5- V�(den stairwaylhallway to Lower Level Arena <br />6- Lobby Addition Reductions <br />Asphalt Shingles $ � 2,000.00 <br />Delete some rubber floor $ 7,000.00 <br />Minimize sitework $ 5,000.00 <br />Countertop material $ 3,000.00 <br />Reuse exist opening $ 1,000.00 <br />Delete auto door openers $ 3,000.00 <br />Steel joists not beams $ 6,000.00 <br />Delete south dormer $ 5,000.00 <br />� <br />� <br />� <br />��,���.�� <br />1 �,���.�� <br />��.���.�� <br />6-Total Potential Lobby Addition Reductions � ��,���.44 <br />8- Facility Monitoring Equipment � ��.��0 0� <br />TOTALOVERAGEAFTERREDUCTIONS $ ��,���.�}� <br />OTHER UKNOWN COSTS <br />SAC/WAC � 1 �,��� �� <br />Performance Bond �?? <br />