My WebLink
|
Help
|
About
|
Sign Out
Home
2005_0214_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2005
>
2005_0214_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 4:15:39 PM
Creation date
9/14/2009 9:59:33 AM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council Regular Meeting — O1/31/05 <br />DRAFT Minutes - Page 34 <br />decreased wait times for customers; part-time hours versus full- <br />time hours at the Center and traffic flow of customers; internal <br />and external posting of the position; and generation of $170,000 <br />over and above annual operating costs. <br />Maschka moved, Schroeder seconded, authorization to staff to <br />create an additional 3/4 time License Center Representative <br />position with the License Center Division, in accordance with the <br />2005 Adopted Budget. <br />Roll Call <br />Ayes: Maschka, Kough, Schroeder, Ihlan and Klausing. <br />Nays: None. <br />12. Consider Authorizing Engineering Consulting Services to <br />Study Repair Options for the OVAL <br />Parks and Recreation Director Lonnie Brokke provided <br />background information on the chiller barrel problems and <br />repairs at the OVAL. Mr. Brokke noted that the next step in the <br />repairs would be to engage in professional engineering services. <br />A detailed proposal for engineering services was included in the <br />staff report dated January 31, 2005. <br />Mr. Brokke reviewed a detailed proposal from Stevens <br />Engineering that outlines various service options and related <br />costs: <br />Ste 1: Collect information on existin s stem <br />Ste 2: Anal sis and evaluation of existin s stem <br />Ste 3: Pre are final documents and assist with biddin <br />Ste 4: Construction services <br />Ste 5: Evaluate the o tion of a late and frame chiller t e s stem <br />Step 6: Evaluate the feasibility of connecting the Arena to the OVAL's <br />refri eration s stem <br />Mr. Brokke discussed the various steps, separating steps 1 <br />through 4 from steps 5 and 6 as two separate options. <br />Discussion included advantages and disadvantages of the various <br />steps and options; use of funds from the Building Replacement <br />Fund; status of the Task Force and timing of the repairs for user <br />groups; use of volunteer engineering services; the need for <br />professional engineering services to pull it a11 together and <br />Engineering <br />Consulting Services <br />to Study Repair <br />Options for the <br />OVAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.