My WebLink
|
Help
|
About
|
Sign Out
Home
2005_0411_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2005
>
2005_0411_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 11:47:05 AM
Creation date
9/14/2009 10:00:40 AM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
= : ��r�� I�r�� <br />. . . � ����.�.� <br />Thomas Paschke <br />March 7,2005 <br />Page 3 <br />documentation is ready for review and execution as soon as we complete this overall <br />process. <br />Condition 9.1.e <br />Access to the theatre must be provided from both parking lots. This will require a <br />direct pedestrian access from the lower level (west) parking lot. <br />Our new plans denote a large plaza directly in front of the theatre. This plaza contains <br />a grand staircase as well as an elevator providing to provide fluid and easy access for <br />the shoppers on either level o�t�e center to enjoy the offerings on both sections. <br />Condition 9. Lf <br />The Public Works Department must complete the review and approve of the <br />grading, drainage, sidewalk and trail, and utility plans proposed with the General <br />Concept and Final Plan submittal. All plans, including the location of fire <br />hydrants (per Fire Marshall) and utility services connections, require the approval <br />of the Public Works Department. In addition, the applicant is required to receive <br />the approval of the storm water management plan by the Rice Creek Watershed, <br />prior to the Final Planned Unit Development approval by the City Council. <br />Pursuant to the previous submittal, our civil engineer has met with and reviewed the <br />plans with the appropriate representatives. And consistent with the protocol froin the <br />last submission, the plans as revised for this submission represent the requirements set <br />forth. Additionally as with the previous submission, applications for permit will be <br />filed and, thus, this aspect is in process. <br />Condition 9.1.g <br />The provision of a lighting plan for the revised parking lots and the building, <br />which plan must meet the requirements of Section 1010.12 <br />The submitted plans and details do meet these requirements, <br />Condition 9.1.h <br />The provision of a revised landscape plan that incorporates additional plantings in <br />the newly created ct�rb islands and within the area surrounding the storm <br />management pond <br />
The URL can be used to link to this page
Your browser does not support the video tag.