Laserfiche WebLink
Clt of Roseville <br />Y <br />Schedule of Fees and Charges for Service <br />Effective January 1,2005 <br />(n�inia��uin charge — one-half hour) <br />Additional plan review required by changes, additions <br />or revisions to plans ... ..... ..... ..... ..... ..... ..... ..... ..... .... ..... ..... .....$48.41 per hour <br />(minimum charge — one-half hour) <br />For use of outside consultants forplan checking, inspections <br />and similar costs ............................................................................................Actual costsl <br />A.ctua� costs include administrative and overhead costs. <br />Demolition �'en�lit Fee: <br />Tenant i�nproveinent/remodelin� prior to building pennit .S � 1. �� <br />Structures not connected to utilities ���I .� <br />Structures connected to city utilities 5 L���.�W <br />Electrical Permit Fee: <br />Set through yearly contract with Contract Electrical Inspector <br />Fire Safet,y Inspection Fee: <br />An amount equal to eight percent (8°/o) of the a��ount determined by the Building Permit Fee <br />(except for single-family dwellings) to be charged and used to defray the cost of fire safety <br />inspections (Ord. 1237, 3-13-2000, e�� 5-1-2000) <br />Gzadin�/Excavatiai-� Permit Fee: <br />Grading Plan Review Fee <br />50 cubic yards or less .........................................................................1�io fee = <br />51 to 100 cubic yards or less... ................................. $24 20�•r <br />101 to 1,000 cubic ards. . .. . ... . .... ... . . . .. . ..... . . . . . .. ... . . .... . . . .. . . .$38.11 <br />1,001 to 10,000 cubic ards... ............................................................$50.72 <br />10,001 to 100,000 cubic yards —$50.72 for �l �� first 10,000 cubic yards, plus $25.24 for <br />each additional 10,000 ards or fraction thereof. <br />100,001 to 200,000 cubic yards —$277.84 for the first 100,000 cubic plus $13.65 for each <br />additional 10,000 cubic ards or fraction thereof. <br />200,001 cubic yards or more —$414.32 for the first 200,000 cubic yards, plus $7.47 for <br />cach additional 10,000 cubic ards or fraction thereof. <br />Other Fees: <br />Additional plan review required by changes, additions or revisions to approved plans <br />(minimumcharge—one-halfhour) ..................................................�$52.00perhour <br />� <br />� <br />