My WebLink
|
Help
|
About
|
Sign Out
Home
2005_0425_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2005
>
2005_0425_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 12:06:48 PM
Creation date
9/14/2009 10:01:42 AM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cit of Ro sevll�e <br />Y <br />Schedule of Fees and Charges for Service <br />Effective January l, 2005 <br />Minin�um fee <br />Gas fireplace <br />Commercial <br />All cozx�a�ezczal work <br />Movin� Permit Fee: <br />Over private property only <br />Over public streets <br />Investigation fee <br />Pl�anbi��� Permit Fee: <br />Admii�istrative/minimuir� fee <br />Plus, for each fixture opening <br />Miscellaneous work <br />Backflow prevention verification <br />���to-:i.?i.F <br />�� ] .�� <br />1.25 % of estimated job cost <br />�� ] . 5� <br />�] C�3.�} <br />.� �„ 3 �1?h�ti��r <br />$36.00 <br />$8.25 <br />1.25 % of estimated job cost <br />$20.60 <br />Plan Review Fee: <br />When a building permit is required and a plan is required to be submitted, a plan checking fee <br />shall be paid. Plan checking fees for all buildings, except for construction costs in R-1 and R-2 <br />zones which do not involve new single family structures and are of less than fifteen thousand <br />dollars (�15,000.00), shall be sixty five percent (65°/o) of the building permit fee as set forth in <br />Section 901.06 of this chapter, except as modified in M.S.B.C. Section 1300. (Ord. 1110, �-13- <br />1992) <br />The plan review fees specified are separate lees from the permit fees specif ed and are in <br />addition to the permit fees. <br />When submittal documents are incomplete or changed so as to require additional plan r�view or <br />when the project involves deferred submittal items an additional plan review fee shall he charged <br />at the above rate. <br />Expiration of plan review. Applications �for which no permit is issued within 180 days following <br />the date of application shall expire by limitation, and plans and other data submitted for review <br />may thereafter be raturncd to the applicant or destroyed by the building official. The building <br />official may extend the time for action by the applicant for a period not exceeding 180 days on <br />request by the applicant showing t��zat circtitn�s�anccs beyond the control of the applicant l�ave <br />prevented action from being taken. No appiicatioix shall be extended more than once. In order to <br />renew action on an application after expiration, the applicant shall resubmit plans and pay a new <br />plan review fee. <br />� <br />f <br />
The URL can be used to link to this page
Your browser does not support the video tag.