Laserfiche WebLink
Cost Estimates for Secondary Refrigerant Improvements <br />Table 4. Cost Estimates for <br />�Ill <br />Item <br />Remove and dispose of contaminated calcium chlaride mixture <br />All other improvements <br />Total Estimated Construction Costs <br />Estimate, Desi n, and Construction Contin enc, <br />Total Estimated Construction Costs <br />En ineerin Le al and Administrative 15% * <br />Total Estimated Pro'ect Costs <br />� See 0xp�at]ailOn in Coat ESlttl]� section of ihe report. <br />STEP 3— DESIGN <br />Cnst <br />� Owner <br />$60,000 <br />$60,000 <br />$12,000 <br />$72,000 <br />$10.800 <br />This step will be completed once the full evaluation of the chiller renavatian/rep[ace�ncnt options <br />is completed. <br />STEP 4 — CONSTRUCTION <br />This step will be completed following the design of the improvements are complete <br />STEP 5- EVALUATE THE OPTION OF A PLATE ANI) FRAME CH�LLERTYPE <br />SYSTEM <br />General <br />This option was evaluated mainly to deter�nine the feasibility of providing redundancy in the <br />system by replacing the one shell and tube type chiller with two plate and frat�e type chiller <br />packages. There is no measurable difference in efficie�icy between a plate and fra�t�e type chiller <br />system and the existing shell and tube type chiller system. <br />The advantages of a plate and fraE�e type cl�iller system are as follows <br />I, Reduttda�7cy. If there are problerns with one plate and frame system there will be a <br />second system far partial backup. However, since each plate and frame system would be <br />sized far 50% of the total capacity the system would only be capable of operating an one <br />plate and frame system during tl�e colder days of the year. <br />2. Less Space Requiret� The plate and frame systeins are mare compact and generally take <br />up less room than a shell and tube type chiller system. The size of each plate and frame <br />package is approximately 12' x 5' wide. With this option the existing high pressure <br />starage receiver would be replaced with a vertical receiver located 'm the corner of the <br />mechanical room. <br />