My WebLink
|
Help
|
About
|
Sign Out
Home
2005_0613_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2005
>
2005_0613_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2014 8:55:29 AM
Creation date
9/14/2009 10:02:19 AM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
498
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�- DRAFTfor Roseville Ci� Council-- <br />-�1�t Reading, June 13,2005 <br />V. The Roseville Skating Center (RSC) components and challenge in <br />assessing and attributing revenues and costs <br />• The Roseville Skating Center (RSC) is one facility comprised of three different segments; <br />1. RSC Oval <br />2. RSC Arena <br />3. RSC Banquet/Meeti�g Facility <br />• Some eonf-�sio�. exists because the entire Roseville Skating Center is commonly referred to as <br />"The Oval". <br />• The entire RSC serves an estimated 250,000 recreational occasions annually. <br />• Challenge: separating labor/managemeni costs and supplies for the three revenuelcost centers: <br />o All three revenue/co�t centers use the same management, maintenance and operational <br />staff, as well as sharing costs for groundskeeping, parking lot, and common utilities <br />(outdoor security lighting and signage, restrooms, heat for locker rooms, etc.). <br />o Example: The staff working in the front information area prepares money for deposit <br />from all segments, answers questions about all segments, collects admissions for public <br />sessions as well as several other miscellaneous tasks <br />o Example: The Raider Room is considered part of RSC Banque�INleeting Facility, but the <br />utilities are charged to the RSC Arena <br />VI. Task Force Definition of Long Term Financial Viability: <br />• To achieve long-term financial viability: <br />o$100,000 per year in additional income (or reduction in costs) <br />o$150,000 per year in capital for repairlreplacement <br />• Note: <br />o Group focused on long term to outline financial viability beyond immediate repair needs. <br />o Group defined figures above from caz�s��tatioxas and discussion with city finance staff— <br />See Attachments 4 and 5 <br />VII. BackgroundlRS� Oval History — Financial Perspective <br />• As originally conceived, the RSC Oval complex plan was financially viable <br />Deviations from the plan, along with inaccurate financial assumptions, resulted in a business <br />plan which has not performed as forecasted: <br />o The original bonding provided by the State of Minnesota was less than expected <br />o Lodging and restaurant tax proceeds were expected to contribute to potential shortfalls; <br />however, mid-90's changes in tax laws made that avenue of support unavailable <br />o Components such as "Pro-Shop" and "Restaurant" never materialized <br />o There were assumptions made in the initial projections for both income and cost of <br />operations that in retrospect were inaccurate. Over the ensuing years the income has risen <br />to a level closer to the estimates, but the costs were higher than projected <br />� In summary, the Task Force is evaluating a facility already in existence with a high asset value, <br />but has an operating deficit and na plan for eventual replacement or repairs <br />Oval Task Force Final Report Page 8 of 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.