My WebLink
|
Help
|
About
|
Sign Out
Home
2005_0613_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2005
>
2005_0613_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2014 8:55:29 AM
Creation date
9/14/2009 10:02:19 AM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
498
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 4 <br />Review of the Oval's Financial Performance <br />Final Comments <br />From 1993-2003 the Oval, and eventually the Skating Center, experienced operating losses <br />(cash-flow only) of approximately $1.5 million. From 1993-1999, the City relied upon other <br />recreation-type revenues and Recreation Fund reserves to cover the losses. Since 2000, the City <br />has also relied upon property taxes to support operations. <br />The Oval's long-term iinancial viability is heavily dependent on four factors. They include: <br />1) Participant levels <br />2) Participant fee amounts <br />3) Personnel operating costs <br />4) Utility operating costs <br />7�ce rental, which is derived from items #1 and #2, provides 60% of the Skating Center's <br />revenues. No other revenue source provides more than 5%. On the expenditure side, personnel <br />and utility costs account for 75% of the Skating Center's costs. No other cost category exceeds <br />5%. If the Oval is to remain viable for the foreseeable future, it is imperative that the City <br />stabilize these four factors. <br />To summarize; to remain viable and sustainable the Oval (Skating Center) needs to have a cash <br />infusion, above and beyond current revenues generated by the facility itself, of $250,000 <br />annuall . Of this amount, approximately $150,000 is needed to support current operations, and <br />$100,000 is needed for future repairslrenovations. In addition, if the City intends on <br />replacinglrenovating the Skating Center and its components near the end of its useful life (i.e. <br />prior to mechanical or structural failures), a one-time infusion of cash of approximately $500,000 <br />willlikely be needed in the next 5-7 years. This is in addition to any monies that are needed to <br />repairireplace the existing refrigeration unit that is currently failing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.