Laserfiche WebLink
F��I+k� F�����ea���t S�amm�r� <br />A�en� <br />o Annual Tasks (most done durrng the operating season) <br />o Refrigeration <br />• compressor oil change M one day/compressor <br />Top end compressor rebuild N 6 hours/h�ad <br />- Oil seal replacement ^� 10 hours (often includes oil &filter change) <br />• Grease drive motors N'I haur/mator <br />• Pumper repair � 4 hours/valve <br />* Replace vent valve components N semi-annual repair <br />• Replace high pressure liquid valve components � annual repair <br />• Replace pumper valve � special project, 8 hours <br />• Monitor water treatment program N daily <br />. Test water for Bromine levels N 30 minuies/week <br />• Clean and check condenser operation N semi-annual <br />a Check and remedy spray nozzle operation <br />a Change fan drive belts <br />o Check sump <br />Adjust refrigerant level M 2 hours/year <br />o Zamboni Repairs <br />Replace wheel bearings N 2 days/year <br />• Change hydraulic oil ^� 4 hours <br />• Change bearings on vertical conveyor � 1 day <br />• Change hydraulic motor brushes w 6 hours <br />• Replace misc. components as needed <br />• Battery maintenance N 2 haurs�month <br />a Basic Mechanical Repairs <br />. Electrical Repairs <br />• Monitor facility lighting N daily <br />a Replace bulbs � as needed <br />o Replace ballasts r� as needed N'I haur/baflast <br />• Repair switches and outlets ^� as needed <br />. Plumbing Repairs <br />• Work based on evident need or as directed N 2 hours/month <br />. Building Maintenance <br />• Repair Flooring N 4 hours(year <br />■ Repair Locks ^� 8 hours /year <br />• Replace filters, check belts on rooftop air handling unit N 8 <br />hrs/yr <br />• Misc. Repairs ^� 10 hours/year <br />o Ice Rink Repairs/Maintenance <br />. Weekly ice surface maintenance � 5 hours/week <br />■ Dasher board maintenance ^� 6 days/year <br />• Kick plate maintenance N 1 week/year <br />• Plexiglass repair/re�lacement N 2 days/year <br />o Special Projects <br />. Ice Show <br />• Set-up and Take-down � 9 days <br />. Dasher Board Advertising <br />• Set-up, application of new ads, take down of expired ads � <br />1Qh�s <br />• Rebuild Hockey Goal Frame (2) � 4 days/net <br />• Arena Roof Replacement-details provided under park planner report �� <br />