Laserfiche WebLink
Main Pivot Bushings and Bearings <br />Total <br />�..:lOs:�.C� <br />$�..ri{1�.� <br />During the past seven years the city has spent over $15,600.00 on repairs for this vehicle. <br />1995 Ford L 8000 Dump Truck Unit # 125 <br />Vehicle is to have a DOT inspection completed before October 2005. This vehicle could not pass <br />inspection because of frame cracking and worn out bushings on the walking arms that hold the rear <br />axels together. <br />Costs forthis repair and additional repairs ifvehicle is retained are as follows: <br />Frame cracks and bushings <br />Dump box and rear gate <br />Plow controls and attachments <br />Hydraulic lift cylinders for box <br />Total <br />$3,500.00to $4,000.00 (being done now) <br />$1,500.00 to $3,000.00 <br />$1,000.00 <br />$3,000.00 to $6,000.00 <br />$8,000.00 to $13,000.00 <br />During the past seven years the city has spent over $35,000.00 on repairs for this vehicle. This vehicle <br />receives the highest use of our truck fleet due to the additional capacity for hauling. Down time <br />increases costs due to requiring nearly 2 trips of single axle trucks to 1 for this tandem axle truck. <br />� Page 2 <br />