Laserfiche WebLink
City of Roseville 2006 Fee Schedule <br />Electrical Permit Fees <br />�, Minimum fee for each separate inspection of an installation, replacement, <br />alteration or repair is limited to one inspection only: <br />$27.00 <br />li. Services, changes of service, temporary services, additions, alterations or repairs <br />on either primary or secondary services shall be computed separately: <br />� to 300 ampere capacity $50.00 <br />400 amp $58.00 <br />For each additional 100 ampere capacity or fraction thereof $14.00 <br />�'. Circuits, installation of additions, alterations, or repairs of each circuit or sub- <br />feeder shall be computed separately, including circuits fed from sub-feeders and <br />including the equipment served, except as provided for in (D) through (K): <br />0 to and including 30 ampere capacity $7.00 <br />31 to and including 100 ampere capacity $10.00 <br />For each additional 100 ampere capacity or fraction thereof$5.00 <br />�. Maximum fee for single-family dwelling shall not exceed $150.00 if not over <br />200-ampere capacity. This includes service, feeders, circuits, fixtures and <br />equipment. The maximum fee provides for not more than two rough-in <br />inspections and the final inspection per dwelling. Additional inspections are at <br />the re-inspectionrate. <br />£, Maximum fee on an apartment building shall not exceed $60.00 per dwelling <br />unit. A two-unit dwelling (duplex) maximum fee per unit as per single-family <br />dwelling. <br />1��. The maximum number of 0 to 30 ampere circuits to be paid on any one athletic <br />field lighting standard is ten. <br />(�. In addition to the above fees: <br />l� A charge of $3.00 will be made for each street lighting standard. <br />2� A charge of $4.00 will be made for each traffic signal standard. Circuits <br />originating within the standard will not be used when computing fees. <br />j l. In addition to the above fees, all transformers and generators for light, heat and power <br />shall be computed separately at $8.00 plus $.40 per KVA up to and including 100 <br />KVA. 101 KVA and over at $.30 per KVA. The ma�imu�n fee for any transformer or <br />generator in this category is $80.00. <br />l. In addition to the above fees, all transformers for signs and outline lighting shall <br />be computed at $7.00 for the first 500 VA or fraction thereof per unit, plus 5.70 <br />for each additional 100 VA or fraction thereof. <br />I� <br />