City of Roseville 2006 Fee Schedule
<br />Building Permit Fees
<br />City Code Sections; 307,801,802,901, 1014
<br />Buildin� Permit Fee:
<br />Permit fee to be based on job cost valuation. The determination of value or valuation shall be
<br />made by the building official. The value to be used in computing the building permit and
<br />building plan review fees shall be the total of all construction work for which the pernlii is issued,
<br />as well as all finish work, painting, roofing, electrical, plumbing, heating, air conditioning,
<br />elevators, fire-extinguishingsystems and any other permanent equipment.
<br />TOTAL VALUATION
<br />$1(JO to $500.00
<br />$501.00 to $2,000.00
<br />$2,00100 to $25,000.00
<br />$25,001.0� to $50,000.00
<br />$50,00100 to $100,040.00
<br />$100,001.00 to $500,000.00
<br />$500,001.00 to $l,OQ0,000.00
<br />FEE
<br />$30.00
<br />$30.00 for the first $500.00 r,l�is $3.00 for each
<br />additional $100.00, or fraction thereof, to and
<br />including $2,000.00
<br />$76.44 far the first $2,000.00 plus $15.34 for
<br />each additional $1,000.00, or fraction thereof,
<br />to and including $25,000.00
<br />$432.38 for the first $25,000.00 plus $1L18
<br />for each additional $1,000.00, or fraction
<br />thereof, to and including $50,000.00
<br />$709.80 for the first $50,000.00 plus $7.80 for
<br />each additional $1,000.00, or fraction thereof,
<br />to and including $100,000.00
<br />$I,095.64 for the first $I00,000.00 �lu� $6.24
<br />for each additional $1,�00.00, �r fraction
<br />thereof, to and including �SOQ,O�O,Qfl
<br />$3,564.86 for the first $500,000.00 plus $5.20
<br />for each additional $1,000.00, or fraction
<br />thereof, to and includin� $1,000,000.�0
<br />$6,183.06 far the first $1,0OO,OaO.OQ Qlus
<br />$1,000,00100 and up $4.16 for each additional $ I,OQD.00, or fraction
<br />�1-iexeaf
<br />Other Inspections and Fees:
<br />Inspections outside of normal business hours .. ................ ........ ......$55.35 per hour
<br />(minimum charge— two hours)
<br />Re-inspection fees assessed under provisions of the MN State
<br />Building Code .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . .... . .$5 S .3 S per hour
<br />Inspections for which no fee is specifically indicated .................. .....$55.38 per hour
<br />(minimum charge — on�half hour)
<br />Additional plan review required by changes, additions
<br />or revisions to plans .. . . . . . . . .. .... .... .. .... .. .... .... .. .... .... .... . . . .. . . . . ....$55.38 per hour
<br />(minimum charge — on�half hour)
<br />For use of outside consultants for plan checking, inspections
<br />and simi�ar costs ............................................................................................Actual costs�
<br />Acival costs include administrative and overhead costs.
<br />
|