My WebLink
|
Help
|
About
|
Sign Out
Home
2005_1205_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2005
>
2005_1205_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 2:04:27 PM
Creation date
9/14/2009 10:10:56 AM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of the Contract. Such representative shall provide reasonable notice <br />to the Contractor, only be allowed on Contractor's premises during <br />normal business hours and follow all the Contractor'ssafety <br />procedures. <br />4. Estimatinq Materials Composition as Collected: The Contractor shall <br />conduct at least one materials composition analysis of the City's <br />recyclables each year to estimate the relative amount by weight of <br />each recyclable commodity by grade. The results of this analysis <br />shall include: (1) percent by weight of each recyclable commodity by <br />grade as collected from the City; (2) relative change compared to <br />the previous year's composition; and (3) a description of the <br />methodology used to calculatethe composition, including number of <br />samples, dates weighed, and City ro�te{s} used for sampling. The <br />Contractor shall provide the City with a copy of each analysis. <br />5. Estimatinq Process Residuals: The Contractor shall provide the City <br />a written description of the means to estimate process residuals, as <br />defined in the RFP Section 4.29, derived from the City's recyclables. <br />This written description shall be reviewed and approved in writing by <br />the City. This written description shall be updated by the Contractor <br />immediately after any significant changes to the processing facilities <br />used by the Contractor. <br />VI. Compensation <br />1 Compensation to Contractor: City agrees to pay Contractor $2.10 per <br />residential dwelling unit per month in 2006 for bi-weekly cur�si�e <br />collection, processing and marketing of recyclables. For 2006 the <br />City certifies that there are 9,366 c�rrbsi�e units that will receive <br />service. The City will notify the Contractor by December 1 of each <br />year what the certified number of eurbside units will be for the <br />subsequent year. <br />The City agrees to pay Contractor $1.55 per certified multi-unit <br />dwelling per month in 2006. City shall determine the number of units <br />that will receive service during a given month by the last Monday of <br />the previous month. <br />The City retains the right to switch to weekly curbside collection <br />under the timeframe delineated in Section IV. 1. Scheduled Collection <br />Day of this contract. Once weekly service begins the City agrees to <br />pay Contractor a weekly rate. The initial weekly rate will be the <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.