My WebLink
|
Help
|
About
|
Sign Out
Home
ord_1387
Roseville
>
City Council
>
City Council Ordinances
>
1300
>
ord_1387
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2009 9:35:00 AM
Creation date
12/7/2009 9:34:01 AM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Ordinances
Meeting Date
11/16/2009
Ordinance #
1387
Ordinance Title
AN ORDINANCE ADOPTING THE 2010 FEE SCHEDULE
Ordinance Summary
Adopt 2010 Fee Schedule
Ordinance Date Passed
11/16/2009
Ordinance Date Published
11/24/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville 2010 Fee Schedule <br />• <br />Building Permit Fee - En~ineering• <br />$1-$500 $_ $g <br />$501 - $2,000 _ 5 <br />$2,001 - $25,000 _ 2g <br />$25,001 - $50,000 - 50 <br />$50,001 - $100.000 _ ~g <br />$100,001 - $500,000 - 100 <br />$500,0001 - $1,000,000 - 200 <br />In excess of $1,000,000 - 300 <br />Demolition Permit Fee: <br />Fire Safetv Inspection Fee: <br />An amount equal to eight percent (8%) of the amount determined by the Building Permit Fee <br />(except for single-family dwellings) to be charged and used to defray the cost of fire safety <br />inspections (Ord. 1237, 3-13-2000, eff. 5-1-2000) <br />Grading Plan Review Fee -Planning & Zoning• <br />50 cubic ands or less $0 $75 <br /> $100.00 for the first 1,000 cubic $150.00 for the first 1,000 <br />51 - 10,000 cubic yards yards, plus $30.00 for each cubic yards, plus $30.00 for <br /> additional 1,000 yards or each additional 1,000 yards or <br /> fraction thereof fraction thereof <br /> $400.00 for the first 10,000 $400.00 for the first 10,000 <br />10,001 - 100,000 cubic yards cubic yards, plus $20.00 for cubic yards, plus $20.00 for <br /> each additional 10,000 yards or each additional 10,000 yards or <br /> fraction thereof fraction thereof <br /> $600.00 for the first 100,000 $800.00 for the first 100,000 <br />In excess of 100,000 cubic yards cubic yards, plus $10.00 for cubic yards, plus $10.00 for <br /> each additional 10,000 yards or each additional 10,000 yards <br /> fraction thereof or fraction thereof <br />7 <br />Electrical Permit Fee: <br />Set through yearly contract with Contract Electrical Inspector <br />
The URL can be used to link to this page
Your browser does not support the video tag.