Laserfiche WebLink
3. The County shall acquire and pay for all rights of way and easements required for the <br />construction of the project within the grading limits of the plan. Any rights of way that cannot be <br />negotiated will be acquired through eminent domain proceedings. <br />4. All City owned rights of way and easements within the limits of the project for roads, <br />utilities and storm water are hereby granted to the County for project use during construction. <br />5. All County Road C rights of way and temporary easements will be in the name of the <br />County and parking and other regulations will be controlled by the County. <br />6. The County and City shall participate in the costs of construction in accordance with the <br />adopted Ramsey County Public Works cost participation policy. <br />7. The estimated construction cost of items is $8,573,132.01. The costs will be paid by a <br />combination of Federal Aid Highway Funds, County State Aid Highway funds, Municipal State <br />Aid Highway funds and Local Roseville funds. <br />8. Storm sewer construction costs attributable to the road right of way and facilities needed for <br />the road drainage are estimated to be eligible for reimbursement from County State Aid funds. <br />Each agency shall pay for the storm sewer costs as determinedby the MN/DOT hydraulics <br />memorandum. <br />9. Upon completion of the project, the County shall own and maintain the storm sewer catch <br />basins and leads on its County roads and the City shall own and maintain the storm sewer trunk <br />lines within the City. Laterals and drains servicing property within the City outside the road right <br />of way shall also be owned and maintained by the City. <br />10. City shall pay to the County 80% of the cost of grading and storm sewer associatedwith the <br />Fairview Pond. The City shall also be responsible for maintenance of Fairview Pond. <br />11. The City shall be responsible for maintenance of the pond located in the SE quadrant of <br />Snelling Avenue and County Road C. <br />12. The City shall pay to the County 100% of the cost of coloring and stamping the concrete <br />median, after application of Federal Funds. Upon completion of the project, the County shall own <br />and maintain the median. <br />13. The City shall pay to the County 100% of the cost of streetlights provided in the project, <br />after application of Federal Funds. Upon completion of the project, the City shall own and maintain <br />the streetlights. <br />14. All City utilities or facilities modified or added to those provisions presently made in the <br />plans and specifications may be incorporated in the construction contract by supplemental <br />agreement and shall be paid for as specified in the supplemental agreement. Design and <br />construction engineering fees shall be negotiated. <br />�� '�+pC�4-U] � n! 6 <br />