Extrusion plant upgrade 2004 <br />Location: <br />3075 Long Lake Road <br />Proposed completion date: <br />June 2004 <br />Project Details: <br />The project for the Long Lake Road facility centers around the <br />addition of a new blown film line. The new line will raise <br />capabilities in throughput as well as in quality. These changes are <br />necessary to meet the needs of our customers and compete with <br />our competition. <br />A bay where we previously had 2 lines installed is being cleared to <br />make way for the new line. In addition to the floor space the new <br />line will need to have 60 foot clearance for the support structure. <br />The roof over the extrusion area is currently —40 feet thus the roof <br />will need to be raised 20 Feet. <br />A rough time line of the events to take place follows: <br />Feb 2004 Make room on floor plan for new line <br />March/April 2004 Raise roof height <br />May / June 2004 Install new line <br />June / July 2004 Be at full production on new line <br />If there are any questions or concerns <br />Contact: <br />Hood Packaging Corp. <br />Gary Hangsleben or Mike Hill <br />651-636-2504 <br />