Laserfiche WebLink
MAR-2-2004 14:16 FROM:ROOF SPEC IN C 651 73 T0:6517927100 P.2 <br />PROJECT REFERENCES <br />. ,�. <br />Roof Spec, Inc. has extensive project experience. Since 1986 it has performed consulting� <br />design, construction administration and management on over 10,000 roof projects. This <br />experience enables us to be proactive in preventing unforeseen problemsfrom occurring and <br />allowing the job to run smoothly. Below is a short list of related projects. A full reference list is <br />available upon request <br />Proiect Name Location <br />pitol Complex <br />int Paul, Minnesota <br />Correctional Facility <br />Complexes / and 2 <br />Oak Park Heights, Minnesota <br />Hgronomy �eea nous <br />University of Minnesota <br />Saint Paul, Minnesota <br />Enforcement Center <br />Hastings, Minnesota <br />Kamsey c;ounty �av��n <br />Center West <br />Saint Paul, Minnesota <br />Client <br />Mr. Gordon Specht <br />651-215-(3418 <br />�- . . . -� <br />uesignea new quiit-up roor system to <br />replace ballasted EPDM assembly. <br />Coordinated construction to be <br />performed after house to minimize <br />disruption of interior personnel. Used <br />asphalt fume recovery systems at <br />tankers and extended existing air <br />intakes to reduce exposure to asphalt <br />t��$, <br />�te or iviinnesota uesignea new buiit-up mor system ana <br />, Mel l.ovejoy galvanized steel walkway. Designed <br />1-296-0140 supports to adequately support walkway <br />and still allow proper drainage of the <br />roof system. Coordinated walkway <br />railing installation with temporary <br />shutdown of facility secunty, <br />1r. Fred Clayton <br />126244940 <br />Scott Daggett <br />:ota County Facillties <br />1-438-4354 <br />�esignea new sningie root system <br />ncluding gutter modifications, additional <br />nsulation an ventilatfon modifications. <br />uesignea new baiiastea truNi roor <br />system. Cored existing roof system to <br />verify the condition of the in-place <br />insulation and reused this insulation <br />during the new construction. <br />Kamsey t;ounty rroperty uesignea various roor sections <br />Management consisting of coal-tar pitch built-up, and <br />Mr. Julio Mangine single-ply fully adhered EPDM roof <br />651-226-2261 systems. Also performed construction <br />administration services during construc- <br />tion. <br />�CONSULTING • SPEClFiCATIONS • DESIGN • ENGINEERING • CONSTRUCTION ADMINISTRATION • OBSERVATIONS • TESTING <br />