Alternate 4G Add 8 bur oak <br />ADD $1,960 <br />Delete/Substitute Base bid plantings per 04/29/04 Valleycrest letter <br />DEDUCT $8,623 <br />NET IMPACT DEDUCT $561 <br />We are currently pricing two small area additions to the base irrigation plan but have not received <br />pricing at this time. We will recommend on this issue at a future council meeting. <br />Change Orders <br />The following are the change orders we are requesting at this time and a brief description of each. <br />These changes are necessary to construct the project under existing building codes and to result <br />in a project that is functional for the users and have the longevity expected of a public building. <br />The following change orders have been reviewed are recommended for approval at this time. <br />Snectra Contract Floorin� Add $6,495 <br />Add to float the quarry tile floors in City Hall prior to installing the carpet as called out in PR <br />#34. Add <br />$4,657 <br />Change the carpet pattern at the new stair from "Karastan" to "Any Event" as directed by the <br />Architect. (DEDUCT $510) <br />Add new VCT in Rooms 127,128 and 142 as directed in PR #27. This will be a back charQe <br />to Steenber�-Watrud. ADD $2,348 <br />Kendall Doors & Hardware Add $13,568 <br />Add locks for the detention doors at the holding area as called out in PR #5. These locks <br />were not called out in the original drawings or specifications. ADD $5,743 <br />Add a borrowed lite at the hollow metal frame for opening 149 as called out in PR #5. ADD <br />$195 <br />Add for a borrowed lite at opening 1111B. This change was made in the shop drawing <br />reviewprocess. ADD $198 <br />Add for the new door Type A as called out in PR #17. ADD $2,214 <br />Order a new frame for Opening 1108A. Not called out correctly on the drawings. ADD $171 <br />Add to remake Frame 162A, dimensions were not correct on the original drawings. ADD $ <br />189 <br />Add doors, frames and hardware as called out in PR #22. ADD $ 8 0 7 <br />Add doors, frames and hardware as called out in PR #31. ADD $2,692 <br />