Laserfiche WebLink
If an individual tube is deemed to be defective, the tube could be plugged to seal the leak. The <br />cost of plugging a single tube including retesting is .............,.........,.........................$ 500.00 <br />With the repairs and pressure testing complete, the reassembly can begin. Gartner Refrigeration <br />would reinstall the end bells with new gaskets for the end bells as well as the supply and return <br />nozzles. <br />The necessary hoisting equipment, supports, and labdr would be included. With the end bells in <br />place, the insulator would reinsulate the chiller to meet the original design. The reinsulation <br />would be inclusive of Styrofoam colored PVC jacketing and Armaflex "serviceable flange and <br />flanged valves." Flashing, caulk, and sealing of the vapor barrier would be included. The brine <br />solution would then be reintroduced to complete this reassembly of the chiller. <br />City of Roseville Net Price ........................................................................................ $ 29,600.00 <br />As an option should the city wish to consider the removal of the existing 8,000 lbs. of amnlonia <br />and replacing it with new refrigerant grade ammonia, Gartner Refrigeration would include the <br />necessary labor, recovery, transport, refrigerant evacuation, and recharging of the system. <br />City of Roseville Net Price ........................................................................................$ 13,655.00 <br />Another alternate the city may wish to consider the pressure testing of the oval floor system. <br />Gartner Refrigeration would remove the bleeders and relief valves and plug the openings. We <br />would pressurize the rink floor system to approximately 50-70 pounds of pressure using <br />nitrogen. Our servicemen would provide a walk through and visual inspection of the rink floor, <br />floor accesses and compressor room piping using an ultrasonic leak detector and leak test <br />solution to determine if there are any leaks present. Once the leaks have been repaired or the <br />floor deemed sound, we would remove the nitrogen pressure and reinstall the air bleeders, relief <br />valves, and make the city ready for operation. <br />City of Roseville Net Price .......................................................................................$ 3,729.00 <br />It is our recommendation that the city proceed with the first number of items leaving the <br />alternates to be considered a�ter the testing is performed and the results are complied from the <br />above listed items. At that time additional monies may not need to be spent based on the results <br />observed. <br />Terms & Conditions <br />1. Down Payment <br />Purchaser shall pay a down payment of twenty-five percent (25 %) of the total Purchase <br />Price when Purchaser accepts this contract. <br />2. Invoice and Payment <br />Equipment, material, supplies and labor are invoiced on progression and shall become <br />due in full 10 days from the date of invoice. <br />3. Past Due Charge <br />All past due invoices will be subj ect to a service charge of one percent (1 %) of the past <br />due amount per month. <br />Gartner Refrigeration & Mfg. Inc. Page 2A <br />K:1Quotes\0504-9099-0 City of Roseville Rose Oval Chiller.doC <br />