Laserfiche WebLink
GAP STRATEGIES <br />N0.1 <br />Twin Lakes Parkwav Issues <br />The range in savings is from no reduction to $5.5 million based on cost <br />assumptions prepared by the developers. <br />The issues include the following: <br />1. Does Twin Lakes Parkway need to be constructed? What is its route, <br />size and finish? What are the lighting and landscaping amenities? <br />2. A portion of the cost is land which the developers have to pay for. <br />Should the land acquisition cost be included? <br />3. If Twin Lakes Parkway is designed to serve a larger community need, <br />should the larger community bear the cost or a portion of the cost? <br />1 � �f ,94 <br />