Backcharge from Kellington to remove and re-hang doors # 127A and # 137A. Also included <br />in this backcharge is the cost for Kellington to furnish and install temporary doors in these <br />openings so the building balancing could be completed. (Deduct $1,041) <br />Backcharge for Kellington to bondo two cell doors that were damaged during shipping. This <br />work was completed by Kellington. (Deduct $516) <br />Add to replace wood door #L159A, which was damaged by the furnituremovers. The City <br />of Rosevillewill forward this cost to the furniture movers. Add $484 <br />Add to replace wood door #L136B. This door will be used at the police chiefs office. Add <br />$511 <br />Add wood doors and hardware as called out in PR #56 Revisions # 1. Add $5,098 <br />Im��r�,e] Il����l�a�r� .+4dd �10.797 <br />Add for Imperial to spread the owner supplied black dirt around the site. Add $3,704 <br />Add for Imperial to move the contaminated soils off site. Add $343 <br />During the PW building construction, Imperial hit and ruined a floor trench drain. The cost <br />for Northern Air to remove, replace and reinstall the new trench drain was $1,185 .(Deduct $ <br />1,185) <br />Add for Imperial to import 100 C,Y / 180 Tons of recycled class 5 for the police parking lot. <br />This amount was agreed to by the City of Roseville. Add $1,287 <br />Price to repair curbs that were damaged during construction. Add $2,943 <br />Price to replace curb that was removed by the city. The curb contractor was directed to <br />complete this work by the city. Add $3,705 <br />Collins Electric Add $16.401 <br />Deduct to delete the new transfer switch for the existing generator and use the existing <br />transfer switch. (Deduct $1,560) <br />Add to provide separate lighting contractor for exclusivephotocell control of the flag pole <br />lights and the two (2) pole lights adj acent to the sally port entrance as called out in PR #42. <br />Add $417 <br />Revise switches and add a breaker and transformer as called out in PR #43. Add $7,331 <br />Add outlets and revise lighting control as called out in PR #46. Add $1,387 <br />Add to upgrade the flagpole lights as called out in ASI #26, These revised lights are more <br />expensive than the lights originally called out. Add $959 <br />Add for additional conduit as called out in ASI #28. Add $202 <br />