My WebLink
|
Help
|
About
|
Sign Out
Home
2004_0726_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2004
>
2004_0726_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2014 3:34:23 PM
Creation date
12/14/2009 1:43:14 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. <br />I: <br />EXHIBIT "A" <br />2004 FEE SCHEDULE FOR ELECTRICAL PERMITS <br />Minimum fee for each separate inspection of an installation, replacement, alteration or repair is limited <br />to one inspection only: <br />$22.00 <br />Services, changes of service, temporary services, additions, alterations or repairs on either primary or <br />secondary services sha11 be computed separately: <br />0 to 100 ampere capacity $25.00 <br />101 to and including 200 ampere capacity $30.00 <br />For each additional 100 ampere capacity or fraction thereof $14.00 <br />C. Circuits, installation of additions, alterations, or repairs of each circuit or sub-feeder sha11 be computed <br />separately, including circuits fed from sub-feeders and including the equipment served, except as <br />provided for in (D) through (K): <br />0 to and including 30 ampere capacity $ 7.00 <br />31 to and including 100 ampere capacity $10.00 <br />For each additional 100 ampere capacity or fraction thereof $ 5.00 <br />D. Maximum �� -amp�er�n�l�-f�m�lv dwelling sha11 not exceed $1 10.00 if not over 200-ampere <br />capacity. This includes service, feeders, circuits, fixtures and equipment. The maximum fee provides <br />for not more than two rough-in inspections and the final inspection per dwelling. Additional <br />inspections are at the re-inspection rate. <br />E. Maximum bee on an apartment building shall not exceed$50.00 per dwelling unit for the first 20 units <br />and $45.00 per dwelling unit for the balance of the units. A two-unit dwelling (duplex) maximum fee <br />per unit as per single-family dwelling. <br />F. <br />G. <br />The maximum number of 0 to 30 ampere circuits to be paid on any one athletic field lighting standard <br />is ten. <br />In addition to the above fees: <br />1� A charge of $3.00 will be made for each street lighting standard. <br />2� A charge of $4.00 will be made for each traffic signal standard. Circuits originating within the <br />standard will not be used when computing fees. <br />H. In addition to the above fees, a11 transformers and generators for light, heat and power sha11 be <br />computed separately at $8.00 plus $.40 per KVA up to and including 100 KVA. 101 KVA and over at <br />$.30 per KVA. The maximum fee for any transformer or generator in this category is $80.00. <br />I. <br />J. <br />K. <br />In addition to the above fees, a11 transformers for signs and outline lighting shall be computed at $7.00 <br />for the first 500 VA or fraction thereof per unit, plus $.70 for each additional 100 VA or fraction <br />thereof. <br />In addition to the above fees, unless included in the maximum fee filed by the initial installer, remote <br />control, signal circuits and circuits of less than 50 volts sha11 be computed at $5.00 per each ten <br />openings or devices of each system plus $3.00 for each additional ten or fraction thereof. <br />In addition to the above fees, the inspection fee for each separate inspection of a swimming pool shall <br />be computed at $25.00. Reinforcing steel for swimming pools requires a rough-in inspection. <br />
The URL can be used to link to this page
Your browser does not support the video tag.