Laserfiche WebLink
safety and comfort. The intersection delay will not be significantly impacted by the <br />addition of left b� phases. <br />7. With the proposed roadway modifications to County Road B with a continuous median <br />from Snelling to State Farm Road, the i� turn bay lengths should be split so that the left <br />turn lane approaching Snelling is 400 feet long and the left tum lane approaching State <br />Farm is 280 feet long. <br />Page 10 <br />