My WebLink
|
Help
|
About
|
Sign Out
Home
2004_0927_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2004
>
2004_0927_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2014 9:51:44 AM
Creation date
12/14/2009 1:45:25 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council Regular Meeting — 09/13/04 <br />DRAFT Minutes - Page 10 <br />In accordance with Minnesota Statutes, Chapter 429, <br />required published and legal mailed notices have been <br />provided for each of the special assessment public <br />hearings. Lega1 notices appeared in the City's legal <br />newspaper, Roseville Review, on August 17 and August <br />31, 2004. In addition, mailed notices have been sent to <br />each affected property owner in accordance with the <br />statute. Mailed notices were sent August 10, 2004. <br />Affidavits of mailing are available in the office of the <br />Public Works Director. <br />Assistant Public Works Director Debra Bloom reviewed the <br />City's existing Assessment Policy and how footage calculations <br />are made in determining assessment costs. <br />2004 Assessment Summar <br />Project Area Description Project Type <br />Number <br />P-ST-03-02-61 W Victoria frontage road, Sandhurst Street Reconstruction, <br />Avenue to Dead-end Pavement Management <br />Plan (PMP) <br />Feasibilit /En ineerin Estimate: $122,129.74 <br />Final Cost: $114,768.06 <br />% Over/Under Estimate: 6.0% under estimate <br />Project Area Description Project Type <br />Number <br />P-ST-03-02-68 Pineview Court, Dale Court to Cul-de-sac Street Reconstruction, <br />Pavement Management <br />Plan (PMP) <br />Feasibilit /En ineerin Estimate: $57,618.12 <br />Final Cost: $56,236.98 <br />% Over/Under Estimate: 2.4% under estimate <br />Councilmember Kough requested clarification on corner lot <br />assessments and rationale for those calculations; with Ms. Bloom <br />responding. <br />2004 Assessment Hearin Information <br />Pro'ect Number P-ST-03-02-61 <br />Construction Cost: $88,396.85 <br />Other Cost: 26,37121 <br />Total Cost: 114,768.06 <br />Assessable FT/Units: 1,607.40 <br />NOTE: 703.50 is Ci -owned ro er <br />Assessment Per Unit: 100% = 71.40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.