My WebLink
|
Help
|
About
|
Sign Out
Home
2004_1122_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2004
>
2004_1122_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 9:11:41 AM
Creation date
12/14/2009 1:46:00 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�, <br />� <br />� <br />� <br />]� <br />]] <br />1? <br />l3 <br />1� <br />1� <br />I� <br />17 <br />1R <br />l� <br />�0 <br />5. Any work within the Ramsey County right-of- way will require a permit. <br />6. There is sanitary and water available in Oakcrest Avenue. However, it <br />will be necessary to excavate within City right-of-way to connect the new <br />homes to these utilities. Street restoration will be necessary consistent <br />with the City's right-of-way permit policy. Oakcrest Avenue was <br />reconstructed in 1981. <br />7. The proposal must include a tree preservation plan specific to those trees <br />located around the periphery and include a landscape plan. <br />8. This parcel is a non-plattedlot. When platted into Oakcrest Estates will <br />have a park dedication requirement. Since no new park expansions are <br />proposed within this planning district or an adjacent park, it is assumed <br />that the applicant will be required to submit a payment in lieu of land <br />dedication amounting to $1,000 per lot. The method of park dedication <br />(land or fee) must be reviewed by the Park & Recreation Commission and <br />a recommendation included in the final action by the City Council. <br />� ] Ayes: 6 <br />�� Nays: 0 <br />"� Motion carried. <br />�� <br />�� The Planning Commission requested that staff require a review by Xcel and <br />�� inform the developer to be present at the City Council meeting. <br />i� <br />L <br />
The URL can be used to link to this page
Your browser does not support the video tag.