My WebLink
|
Help
|
About
|
Sign Out
Home
2004_1206_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2004
>
2004_1206_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2014 4:35:22 PM
Creation date
12/14/2009 1:46:08 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council Regular Meeting —11/22/04 <br />DRAFT Minutes - Page 27 <br />increased noise, light and air pollution in the Langton <br />Lake area, as well as increased surface water runoff <br />containing pollutants and roadway chemicals into <br />Langton Lake. Ms. McGehee also addressed the <br />existence of the proposed Mount Ridge Road proposed to <br />be added along the west side of the lake. <br />Ms. McGehee addressed the negative impacts that she <br />perceived would be realized from the large retail <br />installation at the corner of County Road C and <br />Cleveland. <br />Ms. McGehee spoke of the need to buffer the park; and <br />the need for mitigation to address potential adverse <br />environmental impacts; alleging that the City will suffer <br />substantial liability exposure for not having completed <br />sufficient review of the potential hazards and in ensuring <br />the health and welfare of the residents of the surrounding <br />neighborhoods. <br />F. Development or construction of public facilities will <br />occur on a schedule other than that assumed in the <br />environmental analysis document or plan for <br />mitigation so as to substantially increase the likelihood <br />or magnitude of potential adverse environmental <br />impacts or to substantially postpone the <br />implementation of identifed mitigation measures. <br />Ms. McGehee cautioned that this plan has not had <br />sufficient review for environmental impacts. <br />G. New information demonstrates that important <br />assumptions or background conditions used in the <br />analysis presented in the environmental analysis <br />document are substantially in error and that <br />environmental impacts have consequently been <br />substantially underestimated. <br />Ms. McGehee noted that TCE had been discovered in two <br />monitoring wells within the area, while the AUAR stated <br />that there was no groundwater pollution. Ms. McGehee <br />noted that the position of the petitioners was that all <br />analysis must be complete and a full mitigation strategy <br />
The URL can be used to link to this page
Your browser does not support the video tag.