Laserfiche WebLink
� Mark Battis, 14 13 Eldridge, noted that the new Ordinance passed December 1999 <br />2 required 25% coverage. He reviewed calculations for lot coverage in the staff <br />3 report. He noted the properiy calculation into Snelling and County Road B <br />4 expands the site. If those areas are excluded, the site is overdeveloped by 3% <br />5 (28% total). Mr. Battis said the project is already over the 25% lot coverage. Mr. <br />6 Battis asked the Planning Commission to recommend the issue of lot coverage be <br />� considered by the City Council. <br />s <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />1s <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />30 <br />31 <br />32 <br />33 <br />34 <br />35 <br />36 <br />37 <br />Chair Klausing closed the public hearing. <br />Motion: Member Rhody moved, seconded by Member Wilke, to recommend <br />approval of the request for vacation of certain utility and drainage easements <br />located on the southeast side of the former HomePlace facility and acceptance of <br />a replacement utility easement, based on the following findings as outlined in the <br />staff report of January 12, 2000: <br />1) The Roseville Engineering Department has reviewed, provided comments, and <br />with the addition of a manhole, approved the proposed design and plans to <br />relocate public utilities. They ha�e determined there is no change in the <br />capacity of the utility services, and only a minor addition to the flow. As-built <br />drawings will be required upon completion of the relocation. The Engineering <br />Department has also determined the proposed easement to be adequate to <br />accommodate the reconstruction of the e�sting utilities. All easement <br />documents must be recorded prior to the issuance of a certificate of occupancy <br />for the new building on the site. <br />2) The applicant (Bradley) is responsible for the full cost of vacating moving <br />and reconstructing the utilities. <br />3) The applicant (Bradley) must submit a utility plan and all utility and drainage <br />easement documents and legal description for the easement to the Engineering <br />Department. The City must release the e�sting utility and drainage easement <br />upon the recording of the new utility and drainage easement. <br />Ayes: 5 -0 <br />Motion carried. <br />Member Rhody questioned changing the interpretation of the lot coverage. <br />38 Motion: Member Rhody moved, seconded by Member Egli, to recommend that <br />39 Council work with staff to define lot coverage definitions and to consider whether <br />4o street easements should be included in the lot coverage. <br />41 <br />42 Ayes: 5 -0 <br />43 Motion carried. <br />44 <br />45 <br />