Laserfiche WebLink
Department Approval: <br />REQUEST FOR COUNCII, ACTION <br />1�Tanager Reviewed: <br />�- <br />DATE: 3/13/00 <br />ITEM NO. : F - 2 <br />Agenda Section: <br />Reports/Recommendations <br />Item Description: Final Acceptance and Maintenance Responsibility for Utilities and Streets as <br />Constructed for Two Developments; Southwind Development on Albemarle Court <br />and Rosetown Ridge Development on Overlook Drive and Rosetown Court <br />Background: In 1996 the grading and utility work began for Rosetown Ridge Development. The <br />area is located west of Dale Street and south of County Road C. The general contractor performing the <br />work, Arnt Construction, completed the final lift of bituminous surface in late summer of 1999. A <br />final punch list was completed and inspected by City staff in December of that year. The owner has <br />requested the City Council accept the utilities, curb and gutter and street for maintenance purposes. <br />The second location, Southwind Development, located on Albemarle Court south of County Road B, <br />had the utility work started in late summer of 1997. The proj ect was completed in the fall of 1999 and <br />a punch list was completed and inspected by City staff later that year. The contractor performing the <br />work was C. W. Houle. The owner has requested the City Council accept the utilities, curb and gutter <br />and street for maintenance purposes. <br />Policy objectives: City policy requires the following steps to be completed to finalize these <br />construction projects: <br />l. Certification from the Civil Engineer in charge of the project verifying that a11 work has been <br />completed in accordance with City of Roseville plans and specifications. <br />2. A resolution by the City Council accepting the project and beginning the two-year warranty <br />period. <br />Financial implications: The public work performed on these two projects was paid for by private <br />developers, Rich Kettler and Larry Alm, without a direct cost to the City. <br />Staff recommendation: All public work items have been completed in accordance with the project <br />plans and specifications, and both developers have met the requirements for final project acceptance. <br />Staff recommends the City Council adopt a resolution accepting the utilities, streets, and curb and <br />gutter as constructed in the Rosetown Ridge and Southwind Developments. <br />