Laserfiche WebLink
A. The County shall provide a property dust control plan that uses screening <br />and wetting the material, as well as erosion control, prior to issuance of <br />annual permits. <br />B. The interim use permit is to allow concrete recycling for two phases of the <br />Larpenteur Avenue reconstruction project. Phase One (2000) is from Arona <br />Street to Oxford Street. Phase Two (2001) is from Oxford Street to Dale <br />Street. <br />C. Concrete recycling may be operated a maximum of 15 working days in each <br />year. Crushing operations shall be limited to 8:00 a.m. to 5:00 p.m. Monday <br />to Friday. No material from sites other than the Larpenteur Avenue project <br />may be hauled, stockpiled, or crushed at the Kent Street Yard. <br />D. The County and/or City shall notify residents within 1,000 feet at least five <br />days before each operation commences. <br />E. The County shall take periodic noise measurements during each operation <br />and during other times as deemed necessary by the County or as requested <br />by the City. <br />Attachments: Location map, project narrative. <br />60-Day Schedule: The application was determined complete on February 25, 2000; deadline for City Council <br />action is Apri125, 2000. <br />Prepared by: Thomas Paschke (490-2236) <br />Q: \ Planning Files\3196_Roseville (Kent St) Interim Use\RCA (032700).doc <br />PF3196 - RPCA (032700) - Page 5 of 5 <br />