My WebLink
|
Help
|
About
|
Sign Out
Home
2000_0724_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2000
>
2000_0724_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2014 4:25:30 PM
Creation date
12/14/2009 1:50:37 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
06/21/00 11:33 '�612 228 0264 RRT/INNOVATE �1002 <br />I \ �\� <br />1�ItOJLGS: Family Academy RRT Project �2017.Q1 <br />TOn City of Roseville <br />FROM: Paul G. May, A1A �� <br />lU9JECTe Narrative for interim Use Permtt <br />DATE: June 2Q, 20Q0 <br />The following is a brief narrative addressing the issues outlined in the interim Use Application. Item <br />20D. for the Family Academy project at the Advent Lutheran Church site located at 3000 Hamiine <br />Avenue. <br />1. A 6 classroom modular building unit (typical photo attached) will be placed on the existing <br />bituminous parking surface. This will not increase of effect the existing drainage amount or <br />pattern. <br />2. The modular unit will result in the loss of approximately 28 parking spaces in the existing <br />parking lot. These spaces are rarely used for the church, as the lots are rarely filled to <br />capacity, according to the pastors, even at holiday or special services. <br />3. The slte circulation will not be affected, as the ftow of traffic to the church will be <br />maintained. The school bus drop off ! pick up route wlll be through the parking area <br />adjaoent to the existing school wing, using the existing entry/exits off Hamllne Avenue. <br />4. The expected length of the modular unit will be 3 years. <br />5. The modular building will be provided with base `skirting' and an accessible ramp. Exterior <br />materials are wood with a very low-pitched metal or membrane roof. <br />6. The modular building wfll be placed a significant distance from all existing buildings and <br />property Ilnes. <br />7. No major change In landscaping is proposed. <br />a. The playground areas for the school will consist of the existing open grass play and also <br />using the asphalt area near the school for hard surface play needs. <br />9. A school s(�n wlll be located near the entrance to the site, Incorporated Into the sign for the <br />existing muslc school. <br />10. Connections for water and sanitary sewer will be either through the exist4ng utilities of the <br />church if there is sufficient capacity, or to the City services located In Hamtlne Avenue or <br />Josephine Road. <br />Enc: Site Plan <br />Attachments <br />RAFFE�TY RAFFERTY TOU�FSON ARCHITECTS <br />2E'3 EAST4 8TREET SANT pAUL, MINhE$pTA 5670'H1q2 <br />Tf1:661?24�891 ■ FAX:651�2S026d <br />
The URL can be used to link to this page
Your browser does not support the video tag.