Laserfiche WebLink
Gottfried Pit Lift Station Modification <br />Preliminary Cost Estimate <br />File 1891-09102 <br />9/14/2009 <br />Unit Quantit Price Total <br />1 Mobilization LS 1$ 20,000.00 $ 20,000.00 <br />2 Grubbin LS 1$ 5,000.00 $ 5,000.00 <br />3 Remove & Reinstall curb and Gutter LS 40 $ 20.00 $ 800.00 <br />4 Remove & Reinstall vinyl fence LS 1$ 2,500.00 $ 2,500.00 <br />5 Remove Bituminous SY 200 $ 3.00 $ 600.00 <br />6 Bituminous paving. TN 50 $ 80.00 $ 4,000.00 <br />7 Site Seedin with Fiber blanket SY 1200 $ 1.75 $ 2,100.00 <br />8 Salva e A . CY 125 $ 6.00 $ 750.00 <br />9 A Base TN 40 $ 12.00 $ 480.00 <br />10 Common excavation LS 1$ 5,000.00 $ 5,000.00 <br />11 Inlet Pipe 18inch RCP LF 37 $ 75.00 $ 2,775.00 <br />12 Inlet Structure LS 1$ 7,500.00 $ 7,500.00 <br />13 Connect 18 INCH RCP to Existing LS EA 1$ 1,200.00 $ 1,200.00 <br />14 Fitting LB 7000 $ 4.00 $ 28,000.00 <br />15 Connect 12 INCH DIP to Existing EA EA 2$ 800.00 $ 1,600.00 <br />16 12 CIP Removal LF 305 $ 10.00 $ 3,500.00 <br />17 12 inch DIP Force Main LF 48 $ 62.00 $ 2,976.00 <br />18 20 inch HDPE open cut LF 430 $ 55.00 $ 23,650.00 <br />19 20 inch HDPE Directional Drill LF 200 $ 135.00 $ 27,000.00 <br />20 Temporary Relocate Control Panel LS 1$ 5,000.00 $ 5,000.00 <br />21 Salvage existing pumps and controls LS 1$ 3,500.00 $ 3,500.00 <br />22 Install LS Piping LS 1$12,000.00 $ 12,000.00 <br />23 Install Stainless Steel Sluice Gates EA 2$ 2,500.00 $ 5,000.00 <br />24 Install Valve Vault with Valves LS 1$ 35,000.00 $ 35,000.00 <br />25 Install new pumps EA 2$ 38,000.00 $ 76,000.00 <br />26 Install new Control Panel LS 1$ 35,000.00 $ 35,000.00 <br />27 Soil Boring EA 2 $3,000 $6,000 <br />28 Pot Hole for utility crossing EA 4 $1,000 $4,000 <br />29 Primary Service Modification LS <br />30 Temporary By-Pass Pumping LS <br />Sub-Total $ 320,931.00 <br />15% Contingency Allowance $ 60,000.00 <br />Estimated Engineering Fees $ 80,000.00 <br />Total Pro ect $ 460,931.00 <br />