Laserfiche WebLink
not more than two rough-in inspections and the final inspection <br />per dwelling. Additional inspections are at the re-inspection rate. <br />E. Maximum fee on an apartment building shall not exceed $70.00 <br />per dwelling unit. A two-unit dwelling (duplex) maximum fee is <br />charged per unit as separate single-family dwellings. <br />F. The maximum number of 0 to 30 ampere circuits to be paid on any <br />one athletic field lighting standard is 10. <br />G. In addition to the above fees: <br />- A charge of $3.00 will be made for each street lighting <br />standard. <br />- A charge of $4.00 will be made for each traffic signal <br />standard. Circuits originating within the standard will not be <br />used when computing fees. <br />H. In addition to the above fees, all transformers and generators far light, heat and <br />power shall be computed separately at $8.00 plus $.40 per KVA up to and <br />including 100 KVA. 101 KVA and over at $.30 per KVA. The maximum fee <br />for any transformer or generator in this category is $80.00. <br />I. In addition to the above fees, all transformers for signs and outline <br />lighting shall be computed at $7.00 for the first 500 VA or fraction <br />thereof per unit, plus $.70 for each additional 100 VA or fraction <br />thereof. <br />J. In addition to the above fees (unless included in the maximum fee <br />filed by the initial installer) remote control, signal circuits and <br />circuits of less than 50 volts shall be computed at $10.00 per each <br />10 openings or devices of each system plus $5.00 for each <br />additional 10 or fraction thereof. <br />K. In addition to the above fees, the inspection fee for each separate <br />inspection of a swimming pool shall be computed at $35.00. <br />Reinforcing steel for swimming pools requires a rough-in <br />inspection. <br />L. For the review of plans and specifications of proposed <br />installations, there shall be a minimum fee of $150.00 up to and <br />including $30,000 of electrical estimate, plus 1/10 of 1% on any <br />amount in excess of $30,000. To be paid by permit applicant. <br />11 <br />