My WebLink
|
Help
|
About
|
Sign Out
Home
100208_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2010
>
100208_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2012 3:38:15 PM
Creation date
2/4/2010 4:49:55 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />Regular City Counal M eeting <br />M onday, June 29, 2009 <br />Excerpt from M eeting M inutes <br />11. PublicHe�arings <br />Attachment B <br />a. Public He�aring for Proposed Construction af a Nase Wall along H ighway 36 <br />as a part af the Ric�e Street I nterchange Proj ect <br />Publ i c Works D i rec;tor D uane Schwartz revi cwed summari zed the eval uati on and <br />design process to-date, based on state and federal environmental rules, for <br />Ramsey County' s reconstructi on of the i nterchange of H i ghway 36 and Ri ce <br />Stre�, f rom prel i mi nary to f i nal desi gn. M r. Schwartz noted that a noi se anal ysi s <br />has i ndi cated that hi ghway noi se i n the northwest quadrant of the i nterchange <br />would eacceed state standards, cre�ating the need to verify that a majority of the <br />property owners adj acent to the noi se wal I are supporti ve of i ts constructi on. <br />M r. Schwartz i ntroduced agency representatives and preser�ters of the proposed <br />noi se wal I, i ncl udi ng Ramsey County Proj ec;t M anager Ji m Tol aas; M arc Goess, <br />with the M i nnesota Department of Transportati on (M nDOT):and Engi neeri ng <br />Consul tants M ark Benson and Eri c Toml i nson with the f i rm S. E.H . <br />18 Presenters provi ded schemati cs of the proposed desi gn of H i ghway 36 and the <br />19 i ntersecti on at H i ghway 36 and Ri ce Stree�, el i m i nati ng one si gnal i zed <br />2 0 i ntersecti on on Ri ce, eveni ng al i gnment and proposi ng a noi se wal I on the north <br />21 si de of H i ghway 36. The presentati on i ncl uded rati onal e and cri teri a i n the noi se <br />2 2 anal ysi s; state and federal standards based on deci bel (dBA ) I evel s and <br />23 differentiations in those standards; and daytime and night-time dBA levels, with <br />24 abatement required when they eacceeded those standards, whenever technically <br />2 5 f e�asi bl e and r�asonabl e. Compari son I evel s f or typi cal dBA percepti ons were <br />26 provided; and impact assessrnents based on computer modeling before and after <br />2 7 proposed constructi on acti vi ti es; and mi ti gati on assessrnent i ndi cati ng barri er <br />28 effectiveness, location, and municipal support for such mitigation. <br />29 <br />30 <br />31 <br />32 <br />33 <br />34 <br />35 <br />36 <br />37 <br />38 <br />39 <br />40 <br />41 <br />Presenters provi ded overal I observati ons f rom both si des of H i ghway 36 and <br />noi se I evel s above state standards today, and predi cted i n the f uture; i nabi I i ty to <br />install a noisewall on the south side based on M nDOT cost-effectiveness criteria; <br />proposed changes i n ramp I ocati ons and ground I i nes that woul d f urther serve to <br />reduce some noise levels; and recommendations, based on that analysis, of a 20 <br />f oot noi se wal I al ong the north si de of H i ghway 36, ul ti matel y aff ecti ng 41 <br />resi dents al ong that si de, w i th terrai n i mpacts provi di ng addi ti onal shi el di ng <br />affects. The proposed I ocati on of the wal I woul d be f rom Western Avenue to i n <br />front of Calibre Ridgetownhomes, with flexibility provided for the location of the <br />wal I based on topography and noise reduction model i ng for ma�ci mum dBA <br />reductions. Sampleconstructiontypesandvie�vswerepresented. <br />42 Presenters noted that local communities impacted were given an opportunity to <br />43 approve or deny proposed noi se wal I constructi on; and advi sed of thei r <br />44 avai I abi I i ty to respond to questi ons and/or concerns of the publ i c and City <br />45 Counci I . <br />Page 1 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.