My WebLink
|
Help
|
About
|
Sign Out
Home
100208_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2010
>
100208_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2012 3:38:15 PM
Creation date
2/4/2010 4:49:55 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Driver is required to record and report to Contractor Dispatch <br />the location of any cart that is damaged and that cart shall be <br />repaired or replaced by the Contractor or designated subcontractor <br />within one (1) week of the report of damage. <br />IV. Collection Requirements <br />1. Scheduled Collection Day: means the day or days of the week on <br />which recycling collection by the Contractor is to occur. The City is <br />divided into 5 zones as designated in Attachment A of the City's <br />RFP. Collection shall occur in each zone on the day of the week <br />indicated in Attachment A. The City will divide each zone so that <br />collection in one portion of the zone will occur on the first week of the <br />month and biweekly thereafter. Collection in the second portion of <br />the zone will occur in the second week of the month and biweekly <br />thereafter. The zones will be divided as designated in Attachment A <br />to this contract. <br />The City may exercise its option to switch to every week collection <br />by notifying the Contractor by November 1. The switch to every <br />week collection would then occur on or about April 22 (Earth Day) of <br />the subsequent year. <br />2. Collection: Curbside collection shall include all those Certified <br />Dwelling Units referenced in the City's RFP, and shall occur as <br />provided in Section 5 of the RFP. <br />Multifamily collection shall include all those Multifamily Dwelling <br />Units referenced in the City's RFP, and shall occur as provided in <br />Section 5 of the RFP. In January and February 2006, Contractor <br />shall assess the frequency of collection service needed for each <br />multifamily complex. Each building shall receive weekly collection <br />unless the City and Contractor mutually agree that a building may <br />receive less frequent collection service. <br />3. Multifamily Buildinq Contacts: City and Contractor shall develop a list <br />of contacts for each Multifamily Building. The contact shall be a <br />resident, manager, owner or owner's designee. Contacts will <br />voluntarily help distribute recycling information to building residents, <br />monitor carts for contamination and communicate with the City and <br />Contractor questions and concerns regarding the recycling service. <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.