Laserfiche WebLink
Attachment D <br />Open House Summary <br />St. Paul Regiana! Water Se�vices <br />Demolifiion of the 30,000,000 Gallon Concrete Reservoir <br />Located in Reservoir Woods <br />The Open House was held on Tuesday, December 15, 2009 from {:Oa <br />p.m. to 8:00 p.m. at the SPRW S offices at 1900 Rice 5treet. The <br />Attendance List is attached. Also in attendance zepresenting SPRWS <br />were: Tim Bagstad, SPRWS <br />Brad Eil�s, SPRW S <br />Steve Campbell, SEH <br />A nurr�3�er o� issues were razsed by the attiendees. They are listed as fallows, along with the <br />responses that were provided. <br />Natse enerated b the crushin e�xi rr�ent. Local demolition con�ractors have indicted that the <br />decibel levels frorn their crushing equipment are similar ta thai of a lawn mower. Because the <br />nearest residence is over 500 feet away and the work is scheduled for early spring, noise impacis <br />on the residents are expected to be rr�inor. Mr. Larry Hudel�a o�Raselawn Ceinetery expressed <br />specific cancerns aboui naise levels during graveside services. Mr. Hudella will be invited to <br />meet with Yhe Contactor at the Pre-Canstruct�on Conference. rf noise levels in tihe ceme�ery are <br />found to be a problem, the Contractors equipment run tirnes can be coardinated with the <br />cemetery schedule as necessary. <br />Dust emissions frarn the crushin� e�uipment. The contract specifications will require the use of <br />spray type dust abatement devices on the crushing equipment. <br />Dischar e of chlorinated water. When the reservoir is dr�ined, the purged water is piped to a <br />pond on the east side of Da�e Street. As a matter of policy, SPRWS dechlorinates aIl stored water <br />prior to� discharge to any s�trface� water�. <br />�tockpilin� of �naterials. Crushed cancrete and soil materials from the demolition will be <br />stockpiled separately for re-use within �he foatprint of the existing reservoir. <br />Presence of asbestos in the reservoir. An inspectiora by a certified inspector will be conducted at <br />the reservoir prior to der�o�ition to deterrnine the presence of asbestos. <br />Traffc �eneration. A minor amount of construction traffic wiTl be genErated on Alta Vista Drive <br />during �nobilization to and demobilization from the site, however the decision to crush the <br />cancrete on�-site will eliminate t�e ne�d for 6QD-900 trips for hauling the materials to a <br />demolitian landfilL <br />Communicatians Plan: A project website has �een Established and can be made accessiblE to the <br />pu�lic. <br />A enc Review: The final demolitian cor�tract docu�rrents will be farwarded to the Minnesota <br />Department of Health for review. <br />s-�ptls�stpwu11�968851-genAl6-rncetlopen h9use summary.doc <br />