Laserfiche WebLink
Attachment E <br />10F environment, plants, and wildlife were of vital importance to the community, while facilitating access for demolition <br />107 and/or construction activities. <br />10� Mr. Lloyd reviewed the access to the reservoir site itself versus Alta Vista Road and the park, noting the service <br />10� roads already on the site that would be utilized by contractors. <br />110 Mr. Lloyd noted an additional question from the caller he had previously mentioned and his question related to <br />111 National security considerations to make sure current and future water sources are secure from tampering and/or <br />11: attack. <br />11: Steve Schneider, General Manager, St. Paul Regional Water Services <br />11� Without providing specifics due to security issues, Mr. Schneider advised that the existing reservoir was secured <br />115 via alarms and other means, and the new one would have similar if not upgraded security functions. <br />11E Discussion among Commissioners, staff and Mr. Schneider included rationale for replacing the 1918 structure, <br />11; built to a higher capacity than now needed due to other facilities, and almost exclusive use by only the City of <br />11� Roseville at this time; construction of the current structure with materials of non-reinforced concrete, and <br />11� deterioration of that structure since its original construction, even though amazing in its structure and architectural <br />12c features in the interior of the tank. <br />12� Mr. Schneider offered to arrange for limited tours for interested city officials, but unfortunately not available for the <br />12� general public due to safety considerations, and the need to outfit visitors with harnessing equipment, etc. <br />123 Chair poherty closed the Public Hearing at 7:13 p.m., with no one else appearing for or against. <br />12� Discussion among Commissioners and staff included clarifying that design/build issues were not before the <br />12� Planning Commission, and since construction of the tower is a permitted use, there would be no further hearing <br />12E before the Planning Commission or City Council, with only administrative review and approval at the staff level for <br />12; those aspects of the project. Mr. Paschke again advised that only purpose for this hearing was for the Interim Use <br />128 application for the crushing operation that required Planning Commission and City Council action. <br />12� Further discussion included the advantages in minimizing impacts by crushing and reusing the materials on-site <br />13c rather than trucking them off site and creating additional truck traffic and noise. <br />13� Mr. Paschke advised that, in reference to crushing operation noises, he had personally visited a crushing site at I- <br />13: 694 and the former Ramsey County Public Works Garage on Rice Street in Roseville, to document the operation <br />13: on film with sound to better determine actual impacts. Mr. Paschke advised that there was minimal noise at 150' <br />134 and that it didn't sound much different than standing next to I-694, with that crushing site located just off Owasso <br />13� Boulevard. Mr. Paschke advised that there was construction-type noise all around the site, but as one moved <br />13E further away, it was not that obvious, and blended with other surrounding noises. Mr. Paschke advised that <br />13; residential properties adjacent to this site were not as close in proximity as homes were for that previous project. <br />138 Commissioners Gottfried and Gisselquist concurred that attempting to complete the crushing operation in the <br />139 spring was fortuitous and that crushing on site, as opposed to the noise and dust from trucks hauling off-site was <br />140 the lesser of two evils in getting the work completed. <br />141 MOTION <br />142 Member Boerigter moved, seconded by Member Wozniak to RECOMMEND TO THE CITY COUNCIL <br />14: APPROVAL of an INTERIM USE for Saint Paul Regional Water Services (SPRWS) to allow the temporary <br />14� recycling of concrete at the Dale Street Reservoir, 1901 Alta Vista Drive, based on the comments and <br />14� findings of Section 4— 6 and the conditions of Section 7 as detailed in the staff report dated February 03, <br />��' 2010; amended as follows: <br />• Condition H: modify completion date from Apri130 to May 15, 2010. <br />Commissioner Wozniak encouraged the applicant and City staff to take every available option to update the <br />149 community with the status of the project as it pertains to final design. <br />15c� Mr. Paschke duly noted this request. <br />151 Ayes: 5 <br />15: Nays: 0 <br />153 Motion carried. <br />Page 3 of 3 <br />