My WebLink
|
Help
|
About
|
Sign Out
Home
100308_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2010
>
100308_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2013 10:00:40 AM
Creation date
3/4/2010 3:57:06 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
256
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COmmUnity - Roseville is a desirable place to live, work and play <br />Strateqy A: Create an attractive, vibrant, and effective city with a hiqh quality of life <br />2.A.2. Promote commercial and residential aesthetics and design innovations; set high standara <br />landscaping and design of public improvements <br />Action Ste�s <br />2.A.2.a Upgrade design standards. Include pathway construction <br />2.A.2.b Create specific area design standards. <br />2.A.2.c Create a landscape ordinance & a practical tree preservation policy <br />2.A.2.d Require add'I boulevard landscaping in single-family areas. Add <br />2.A.2.e Make standards compatible with progressive cities. <br />Dept <br />CD <br />CD <br />CD <br />CD <br />CD <br />Proqress <br />In Process <br />In Process <br />In Process <br />In Process <br />In Process <br />Timeline <br />1-3 yrs <br />1-3 yrs <br />1-3 yrs <br />1-3 yrs <br />1-3 yrs <br />2.A.3. Use infrastructure and other redevelopment efforts to reduce or eliminate visual pollutant: <br />overhead power, cable, and telephone lines, traffic controllers and junction boxes, etc. <br />Action Steps Dept Proqress Timeline <br />2.A.3.a Include in design standards. Require as a part of any development CD In Process 1-3 yrs <br />2.A.9. Encourage tree preservation and replacement; make Roseville "b/oom" by encouraging d� <br />landscaping <br />Action Steps Dept Proqress Timeline <br />2.A.9.a Upgrade design standards. Undertake systemic code review , to CD In Process 1-3 yrs <br />2.A.9.b Create specific area design standards. CD In Process 1-3 yrs <br />2.A.9.c Create a landscape ordinance & a practical tree preservation policy. CD In Process 1-3 yrs <br />2.A.9.d Require additional boulevard landscaping in single-family areas. CD In Process 1-3 yrs <br />2.A.9.e Make standards compatible with progressive cities. Develop In Process 1-3 yrs <br />information for residents regarding environmental and landscaping <br />for energy preservation, water quality, tree preservation, etc.(PC) <br />2.A.10. Keep city clean and inviting; enforce nuisance ordinances <br />Action Steps Dept Proqress Timeline <br />
The URL can be used to link to this page
Your browser does not support the video tag.