My WebLink
|
Help
|
About
|
Sign Out
Home
2008-03-25_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
200x
>
2008
>
2008-03-25_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2010 12:26:03 PM
Creation date
3/23/2010 10:04:27 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
3/25/2008
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIGURE 16 ESTIMATION OF INFILTRATION /INFLOW <br />Meter Shed <br />Estimated Residential Equivalent Connections <br />Inch Miles of Sewer pipe (w/o services) <br />Method 1 -NOT APPLICABLE FOR TEMPORARY METERS <br />100 ""`** <br />174.6 in-mi <br />Method 2 -Assume early morning low flow is entirely inflitration (clear water) <br />May -September 2007 <br />8/23/2007 Daily Flow <br />Drv Dav -Early Morning Flow <br />Infiltration rafe: (EMFlin mi) <br />Wastewater per connection: <br />Peak Flow 8128/07 <br />Peak Hour Rate: 9:00 hrs <br />Drv day flow at time <br />Normal Peak <br />Adjusted Peak <br />Calc. PIA Ratio <br />914 gpd/in mi <br />1,874 gpd/connection <br />22,450 <br />19,100 gph <br />gph 0.539 <br />0.458 mgd <br />mgd <br />3,350 gph 0.080 mgd <br />inflow per connection <br />0.460 <br />0.54 mgd <br />1.56 <br />804 gpd/connection <br />Inflow per in mile 460 gpolin mi <br />
The URL can be used to link to this page
Your browser does not support the video tag.