My WebLink
|
Help
|
About
|
Sign Out
Home
2008-07-22_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
200x
>
2008
>
2008-07-22_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2010 2:25:00 PM
Creation date
3/23/2010 12:02:38 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
7/22/2008
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Google Maps <br />Page 2 of 2 <br />includes Fairview Avenue {from County Road B-2 to Larpenteur Avenue}, Larpenteur Aveneue {from Co. Rd. B-2 to <br />Coffman} and Fortner Avenue (Between Larpenteur and the intercampus transitway). The project consists of the <br />construction of bike and pedestrian facilities to create a more livable street. The project creates bicycle and <br />pedestrian facilities for all levels of users including commuter and recreational bicyclists, access to local businesses, <br />dining, and retail for pedestrians. <br />,~ LS 17 -Northeast Suburban Campus Connector (NESCC <br />`r The Northeast Suburban Campus Connector (NESCC} Bike/Pedestrian Project connects the three communities of <br />Falcon eights, Lauderdale, and Roseville to the University, both St. Paul and Minneapolis Campuses. This corridor <br />includes Fairview Avenue (from County Road B-2 to Larpenteur Avenue}, Larpenteur Aveneue (from Co. Rd. B-2 to <br />Coffman) and Fortner Avenue (Between Larpenteur and the intercampus transitway). The project consists of the <br />construction of bike and pedestrian facilities to create a more livable street. The project creates bicycle and <br />pedestrian facilities for all levels of users including commuter and recreational bicyclists, access to local businesses, <br />dining, and retail for pedestrians. <br />,: BWS. 11 - NE Filmore and 6th Avenues <br />The Filmore/6th Avenue Bike Walk Street project will provide a biking and walking corridor along this residential <br />street, one block west and parallel to Cedar Avenue in South Minneapolis. The Bike Walk Street will intersect with <br />the Grand Rounds in Northeast Minneapolis and end at the Stone Arch Bridge downtown. <br />® BWS_11 - NE Fllmore and 6th Avenues <br />T The Filmore/6th Avenue Bike Walk Street project will provide a biking and walking corridor along this residential <br />street, one block west and parallel to Cedar Avenue in South Minneapolis. The Bike Walk Street will intersect with <br />the Grand Rounds in Northeast Minneapolis and end at the Stone Arch Bridge downtown. <br />,~ BWS 17 -Oliver Avenue <br />This project will acquire an easement over one parcel and pave a 1000-foot off-road trail to create aped/bike path <br />(Madison Park Trail) along Highway 62 and a bicycle boulevard on Oliver Avenue. <br />BWS. 13 -Highland. Par_k_w~ <br />The scope of this bike/walk project is to provide a bicycle boulevards that connects the City of Minneapolis to the <br />Sam Morgan Trail via the City of St. Paul and the Fard Bridge. The facility will begin on Mississippi River Boulevard <br />at the Ford Bridge, fallow Highland Parkway to Edgcumbe Road to a terminus at Lexington Parkway. <br />.j BWS 13 -Highland Parkway/Edgcumbe <br />''~ The scope of this bike/walk project is to provide a bicycle boulevards that connects the City of Minneapolis to the <br />Sam Morgan Trail via the City of St. Paul and the Ford Bridge. The facility will begin on Mississippi River Boulevard <br />at the Ford Bridge, follow Highland Parkway to Edgcumbe Road to a terminus at Lexington Parkway. <br />Q LS 17 -Northeast Suburban Campus Connector <br />The Northeast Suburban Campus Connector (NESCC} Bike/Pedestrian Project connects the three communities of <br />Falcon eights, Lauderdale, and Roseville to the University, both St. Paul and Minneapolis Campuses. This corridor <br />includes Fairview Avenue (from County Road B-2 to Larpenteur Avenue), Larpenteur Aveneue (from Co. Rd. B-2 to <br />Coffman} and Fortner Avenue (Between Larpenteur and the intercampus transitway). The project consists of the <br />construction of bike and pedestrian facilities to create a more livable street. The project creates bicycle and <br />pedestrian facilities for all levels of users including commuter and recreational bicyclists, access to local businesses, <br />dining, and retail for pedestrians. <br />BWS 17 -Oliver Avenue <br />This project will acquire an easement over one parcel and pave a 1000-foot off-road trail to create aped/bike path <br />(Madison Park Trail) along Highway 62 and a bicycle boulevard on Oliver Avenue. <br />(~ LS 16 -Richfield Parkway <br />~/ This project will construct a 2640-foot bike/ped trail on the west side of Richfield Parkway to 63rd Street and also <br />continue the trail through the Park to 62nd Street in Richfield. A raised median will be built where the trail crosses the <br />new Parkway. A public gathering space will be provided. <br />http://maps.google.com/maps/ms?h1=en&g1=us&ie=UTF8&oe=UTF8&msa=0&msid=11148436899966... 07/17/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.