Laserfiche WebLink
15.1. Design elements shall consist of signage, trail markings, curb cuts, driveway crossings; <br />medians/dividers, intersections/crosswalks, furniture, lighting; walls, and typical pathway <br />and roadway sections. <br />15.2. Develop a design goal to provide a boulevard between pathways and roadways that. lends <br />itself to civic beauty and traffic calming. <br />l 6. Establish a formal review process for new and renovated public and private development <br />projects that addresses pedestrian and bicycle issues. <br />16.1. City staff will utilize the City Plan Review Process to ensure consistency with the <br />Pathway Master Plan. <br />16.2. Staff will develop and use a checklist to aid in the plan review process that shall be <br />required to complete prior to plan approval. <br />l7. Pathways shall be part of roadway design and construction. <br />] 7.l . The City shall consider pathways as part of the transportation system. <br />17.2. The City recognizes that residents adjacent to the pathways may not be the only <br />beneficiaries. <br />l8. Seek ways to encourage businesses to address light traffic issues through the <br />redevelopment of their property. <br />l 8.1. Provide incentives (low interest loans) for Roseville businesses to redevelop their property <br />with improvements for light traffic. <br />MAINTENANCE <br />l9. Pathways will be kept in goad repair and useable. <br />19.1. During winter, the highest use pathways shall be cleared of snow to bare pavement. <br />19.2. During winter, the medium use pathways shall. be cleared of enough snow to allow <br />passage. <br />19.3. During winter, the low use pathways will not be cleared of snow. <br />] 9.4. Pathways will be cleared. within 24 hours after a snowfall. <br />19.5. All paved pathways shall be swept once during the spring and once during late summer. <br />19.6. Vegetation encroaching in pathway corridor shall be trimmed to allow safe passage <br />according to MnD~T standards. <br />19.7. All pathways and their related facilities shall be inspected annually. Inspection data shall <br />be entered into a management system to help guide the maintenance and replacement <br />decisions. <br />20. Maintenance responsibilities will be assigned based on function and use of the facilities. <br />20.1. The City will be responsible for all pathway maintenance. <br />20.2. Residential property owners will be encouraged to clear snow from pathways. <br />20.3. Commercial and institutional property owners will be responsible to clear snow from <br />City of Roseville Pathway Master Plan <br />Final Review Drafl August 2008 Page 22 of <br />34 <br />