My WebLink
|
Help
|
About
|
Sign Out
Home
2008-08-26_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
200x
>
2008
>
2008-08-26_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 2:41:36 PM
Creation date
3/23/2010 12:21:58 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
8/26/2008
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J Fills a void in pathwa network. 4 S 20 <br />123 <br />Detailed Description of Priority Proiects <br /> Project Name Descri tion <br />l County Road D Develop pathway facilities, both on and off road between <br /> Cleveland and Fairview Avenue. <br />2 County Road C-2 West of Develop both on and off road pathways within. the County <br /> Snelling Road C-2 alignment from the west City Boundary to Snelling <br /> Avenue. This corridor would include a grade separated <br /> crossing of 3SW. <br />3 County Road C-2 East of Develop both on and off road pathways within the County <br /> Snelling Road C-2 aligmnent from the Snelling Avenue to Victoria <br /> Street. <br />4 County Road C Construct an on-road bicycle facility from Lexington Avenue <br /> to Rice Street. <br />5 County Road C Sidewalk Construct a sidewalk on the north side of County Road C <br /> from Western to Rice Street. <br />b Count Road B-2 Develo sidewalk from Lexington. Avenue to Rice Street. <br />7 County Road B An off-road. trail will provide connection from Highway 280 <br /> to Cleveland Avenue. <br />8 Roselawn Avenue Develop both on road and off-road. pathways from TH 280 to <br /> Lexin on Avenue. <br />9 La enteur Avenue An off-road trail from Reservoir Woods to Galtier Street. <br />10 Cleveland Avenue Develop pathway, both on and off road, between County <br /> Road C and Count Road D. <br />11 Fairview Avenue (north of Development of both on-road and off-road pathways between <br /> B-2) Count Road B_2 and Count Road D. <br />1Z Fairview Avenue (south of Development of both on-road and off-road pathways between <br /> B-2) Roselawn Avenue and Count Road B-2. <br />13 TH S l connection to Old Work with Arden Hills to develop a regional pathway <br /> Snelling (Arden Hills) connection along Snelling Avenue to Old Snelling Avenue in <br /> Arden Hills connecting Roseville to MoundsView High <br /> School, Valentine Hills Elementary School, Bethel College, <br /> Lake Johanna Park and County Road E2 commercial <br /> businesses. <br />14 Hamline Avenue An off-road trail from Count Road B-2 to TH 51 (Snellin ). <br />15 Lexington Avenue Develop an off-road trail. on the east side of Lexington <br /> Avenue from Larpenteur Avenue north through the City <br /> connecting. to Shoreview's athway system. <br />1b Victoria Street (north of C} Develop an on- road and off-road pathway from County Road <br /> C to Count Road D. <br />17 Victoria Street {B to C) Develo an on- road. and off-road athwa from Count Road <br />City of Roseville Pathway Master Plan <br />Final Review Draft August 2008 Page 28 of <br />34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.