Laserfiche WebLink
Dredged Materials Management -Minnesota Pollution Control Agency <br />Page8of10 <br />A Notification to Manage Dredged Materials (Notification) must be completed and <br />submitted for all projects not requiring an MPCA permit. A Notification form is attached, <br />and must be submitted at least 30 days prior to the initiation of dredge activities. In some <br />cases, MPCA staff maybe able to waive the 30 day requirement, or reduce the amount of <br />time needed for MPCA review. <br />. ~ ~ Notification to Mana eg Dredged Materials without a Permit (Notification) <br />Within this 30 day timefraine, MPCA staff will review the Notification and either concur <br />with the determination, or determine that a permit or additional information, such as <br />additional sampling or monitoring, is required. If the MPCA concurs with your <br />determination that a permit is not required, a formal response will not be sent; dredge <br />activity can commence at the end of the 30 day time period. If, after review of the <br />Notification submitted, the Agency does not concur with your determination that a permit is <br />not required for the project, the Agency will notify you of this determination within the 30 <br />day time period. Dredging activity may not commence until the discrepancy has been <br />resolved and a permit issued for the project, if required. <br />In addition to completing and submitting the Notification form, dredged materials must be <br />managed in accordance with specified Best Management Practices (BMPs) to protect <br />ground and surface waters of the state. BMPs for the management of dredged material on <br />the attached MPCA fact sheet. <br />. ~ Best Management Practices_for the Management of Dredged Materials <br />Storage and/or disposal of de minimus volumes of dredged material is authorized if <br />managed in accordance with the guidance in the BMP fact sheet. <br />Dredged Material Management Forms <br />For Projects Requiring a Permit <br />Apply for permit coverage using the following forms. <br />. ~} ~ Transmittal Form <br />. ~' ~ Attachment for Dredged _Material Management <br />For sites and/or projects requiring a permit, an annual report describing the disposition of <br />the dredged materials is required. <br />. ~ ~ Annual Dreamed Material Report <br />For Projects NOT Requiring a Permit <br />For projects not requiring permit coverage, complete and submit the Notification form: <br />. ~ ~ Notification to Manage Dredged Materials without a Permit (Notification) <br />Other Environmental Issues <br />In addition to the water quality concerns at these types of facilities, other environmental <br />http://www.pca.state.rnn.us/water/dredgedmaterials.html 11/20/2008 <br />