My WebLink
|
Help
|
About
|
Sign Out
Home
2009-04-28_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
200x
>
2009
>
2009-04-28_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2010 2:28:01 PM
Creation date
3/23/2010 2:26:52 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
4/28/2009
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
:371 Recommended 2009 action: <br />372 We have scheduled. another workshop for April 29, 2009. <br />373 B. Sennett Lake Shoreline Improvement Project <br />374 In 2008, the City of Roseville completed an exciting partnership project with Prince of <br />375 Peace Lutheran Church and the Ramsey Conservation District (RCD) to protect the water <br />376 quality of Bennett Lake. Runoff from. the parking lot and slope adjacent to Prince of <br />377 Peace Church had been washing down the hill into Central Park, over the years this <br />378 developed into an erosion issue that washed sediment into Bennett Lake. The shoreline of <br />379 Bennett Lake has also experienced significant sloughing, causing damage to the lower <br />380 path. <br />381 The first phase was done on the church property. The RCD worked with Prince of Peace <br />382 to make changes to the way their runoff was handled. The improvements included <br />383 construction of two rain gardens and filling the erosion gully that has formed between the <br />384 upper and lower pathways. Volunteers from the Church made the improvements in late <br />385 summer and will maintain these new features. <br />386 The second phase was a shoreline restoration project for the portion of Bennett Lake <br />387 located adjacent to the Prince of Peace improvements. The plan was developed by RCD <br />388 and City staff coordinated. its implementation. The work was completed by Scout <br />389 members, family, and friends and the Minnesota Conservations Corps, anon-profit <br />390 organization. <br />391 In the spring, Dwayne Stenlund, PWETC commissioner, asked if we had any projects <br />''392 that an Eagle Scout candidate could. help us out with. He recommended that we use Josh <br />393 Chamberland to lead this first part ofthis project. Josh put together a work plan to <br />394 complete the project, organizing tools, food, water, and breaks. He spent hours working <br />395 through the logistics for the project, visiting the site, looking over the plans, and working <br />396 out how we would accomplish the work. During the two Saturdays that the work was <br />397 completed, he coordinated the- volunteers and provided supervision. His volunteers <br />398 completed the first part of the project; removal of buckthorn on the slope between the <br />399 upper and lower pathways west of the waterfall and the construction of a wave wall to <br />400 protect the shoreline. <br />401 This work was completed in August on two separate Saturdays. On the first day, 30 <br />402 volunteers worked for almost S hours removing the buckthorn on the slope between the <br />403 two pathways.. The buckthorn was laid out and allowed to dry for three weeks. On the <br />404 second Saturday, the volunteers worked for 5 hours, constructing a. wave wall along the <br />405 shoreline out of buckthorn to protect the shoreline to be restored. Throughout the project <br />406 Josh provided leadership to the workers, ensuring that the work was completed as laid out <br />407 in the plan. <br />408 During September, members of the Minnesota Conservation Corps completed the work <br />409 that Josh started, restoring the shoreline and stabilizing the erosion gully between the <br />410 upper and lower paths. It is anticipated that additional vegetation will be planted along <br />411 the shoreline in spring 2009. The wave wall will remain in place until the vegetation on <br />412 this shoreline is established. <br />413 <br />City of Roseville <br />2008 Storm Water Annual Report Page 11 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.